Happy bank holiday
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
I know I was finishing the trusses off on a roof in the saddelworth valley thick fog and rain and stuck up on a roof yuk, and today's delight 3 hour drive each way for mrs grandmas funeral up near Middlesbrough.
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
Technically yes they are same. I usually refer to building as most of it is done manually ie brick on brick etc; i use construction as a term for say main frame building where heavier plant like cranes are used for shutters, steel etc: Just my way of thinking. Actually i worked all day in it when i got home i planted up a load of shrubs and bedding plants. First time i have been sent home and as soon as the boss said it i was gone incase he changed his mind. And here's me thinking you where tough :;): :laugh:
sean
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
tough as in leathery maybe :laugh: :laugh:
my old hoddy went with a groundworks firm (big-sh about 100 men)
and he said the big difference between the subby brickwork sites and the groundworkers was the hours
bricklayers 8-4.30
groundworkers 7.30-5.30
and also if it rained on a brickwork job everyone went home
the groundworkers just put their wet suits on
but as with most firms now we work on a no lay- no pay basis
I dont mind the odd half hour rain break but half a day is unsustainable for small firms
cheers LLL
my old hoddy went with a groundworks firm (big-sh about 100 men)
and he said the big difference between the subby brickwork sites and the groundworkers was the hours
bricklayers 8-4.30
groundworkers 7.30-5.30
and also if it rained on a brickwork job everyone went home
the groundworkers just put their wet suits on
but as with most firms now we work on a no lay- no pay basis
I dont mind the odd half hour rain break but half a day is unsustainable for small firms
cheers LLL
-
- Posts: 985
- Joined: Wed Aug 15, 2007 3:02 pm
- Location: Staines Surrey
- Contact:
I'd love to work in just dry weather!!!! Coming to the time of year where there will be no option
Roger Oakley BDA(Europe)Member 2006
R&A Pressure Washing Services Ltd
info@rapressurewashing.co.uk
www.rapressurewashing.co.uk
R&A Pressure Washing Services Ltd
info@rapressurewashing.co.uk
www.rapressurewashing.co.uk
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
Our hours 8.00 till 5.00, should be 7.30 till 6.00 but residents put the block on it. but even those are short hours compared to my last life on large 'construction' sites. nice to be home before 6.30 for first time in 15 years work, usually 8.45ish. Obviously choice is up to the individual re-working in the rain. One day it was light rain, then came the usual nonsense comments '' it's the kind of rain that gets you wet,'' and ''i'm soaking wet,'' ''this is shite i bet all the other sites have gone home.'' laugh: ???
sean