Page 1 of 1

Posted: Tue Nov 15, 2011 10:48 am
by Tony McC
As many of you know, my bulging sack of emails regularly throws up the odd request or two, but this one really has me stumped.....


company: business
Location: banglore
question: can you give me a brief description of how to construct a residential apartments of 5 floors i want the whole information please


Now, obviously, i was thinking that it's best to do the ground floor first, and then probably the second. As a general rule, I'd build the thrird floor before the fourth, but I'm quirky that way. I'd do the fifth floor last and then bang on the roof, but maybe someone in the Brew Cabin has a better answer?

Posted: Tue Nov 15, 2011 2:20 pm
by local patios and driveway
Bangalore?

Services:
fix all wiring to outside of building and heavily overload all capacity of any cables and Run main sewage to kerb.

Posted: Tue Nov 15, 2011 4:08 pm
by Carberry
Like this:
http://www.youtube.com/watch?v=E76uJi744Do

edit: this one is even better. The house is tasty too!
http://www.youtube.com/watch?v=akGfi53mH2k&feature=related

Posted: Tue Nov 15, 2011 4:54 pm
by lutonlagerlout
theres a village missing one
ROFL
LLL :laugh:

Posted: Tue Nov 15, 2011 5:00 pm
by seanandruby
same as we did the control tower at heathrow.....top first then jack it up and so on..... Was nice interesting job. Got a dvd somehere, speeded up tho'. If I find it I'll post it to you

Posted: Tue Nov 15, 2011 5:47 pm
by Pablo
this is a job for Mr Ethan

Posted: Tue Nov 15, 2011 8:10 pm
by local patios and driveway
Just needs to find the answer online and copy it. :D

Posted: Tue Nov 15, 2011 8:15 pm
by haggistini
Pablo wrote:this is a job for Mr Ethan
Spot on !! Haaaa haaaaa!