Not been asked in a while, how are people doing for work? Ive been bust since this time last year, but things are going quiet.
Im hoping i should scrape through till xmas, after that...... i dunno.
Putting a "communal" utilities trench in 400 mtrs up a field at the minute.
900mm twin wall, perforated 100mm twinwall, 150mm underground waste, 50mm water, 32mm water, reinforced cable no duct, 3 phase cable ducted and bt duct, and my god its serious graft the end of the trench is like a bloody octopus.
Giles - youd like the plant mate, brand new 8t kubota and 5t taekuchi tracked swivel tip dumper
Im hoping i should scrape through till xmas, after that...... i dunno.
Putting a "communal" utilities trench in 400 mtrs up a field at the minute.
900mm twin wall, perforated 100mm twinwall, 150mm underground waste, 50mm water, 32mm water, reinforced cable no duct, 3 phase cable ducted and bt duct, and my god its serious graft the end of the trench is like a bloody octopus.
Giles - youd like the plant mate, brand new 8t kubota and 5t taekuchi tracked swivel tip dumper
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
just need a klenex haha
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
-
- Posts: 1951
- Joined: Sat Dec 06, 2008 10:28 pm
- Location: Preston, Lancashire
ha ha not a bad job really, im enjoying it. we are connecting in to the land drains as we go up the field, the 900mm twinwall is connecting in to the new road gulleys, can all be quite difficult in a slippy trench. The 50mm main takes some handling as it comes off the roll, it flicked round yesterday and gave my man a black eye lol
-
- Posts: 1366
- Joined: Fri Apr 15, 2011 9:05 pm
- Location: Edinburgh
Been running about like a blue arsed fly for the last few months. Booked out well in advance all year. Sales for all aspects of my business have increased and I've expanded and started selling welding gas.
Stopped all landscaping advertising end of July.
Got 1 big job about to finish, soon as customer chooses coping and caps that he likes. Got 1-2 weeks worth of 1-2 day jobs still to do. then it should all go quiet on the landscaping front ready for me to be doing deliveries of gas all day.
Stopped all landscaping advertising end of July.
Got 1 big job about to finish, soon as customer chooses coping and caps that he likes. Got 1-2 weeks worth of 1-2 day jobs still to do. then it should all go quiet on the landscaping front ready for me to be doing deliveries of gas all day.
-
- Posts: 1951
- Joined: Sat Dec 06, 2008 10:28 pm
- Location: Preston, Lancashire
-
- Posts: 1366
- Joined: Fri Apr 15, 2011 9:05 pm
- Location: Edinburgh
-
- Posts: 1405
- Joined: Thu Sep 27, 2007 10:29 am
- Location: South Wales
- Contact:
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
weve been mega busy all year but had 2 weeks off the other week after cancelled job but filled my time updating stuff and just enjoying a bit of time off but need some time to do some bits on my house, got a cellar to convert into boys room and my bathroom to redo. but its finding the time to get it done, off at 6.30am tomorrow to wrexham got 40m3 concrete slab to pour at hospital and finsih to +/- 5mm tough one that on a 16mx10m slab lol
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
-
- Posts: 1568
- Joined: Mon May 10, 2010 9:58 pm
- Location: Gatwick
- Contact:
Not good down here, plodding along, week by week but never more than two weeks booked up. Friend of mine has copied digger templete and is now competing with me at a cheaper rate... Not nice really, seeing as i spent a bit of time teaching him how i advertise for another business he had, only for him to stiff me 6 months later with my own methods
-
- Posts: 1405
- Joined: Thu Sep 27, 2007 10:29 am
- Location: South Wales
- Contact:
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
very quiet on the extension front down here,but you have to adapt to the situation so we are doing wet rooms and access ramps for the council
not my favourite laying 2 by 2 's all day long but its work
3 years in to this recession so far and its starting to grate....
got work past xmas but like LPAD its bitty
LLL
not my favourite laying 2 by 2 's all day long but its work
3 years in to this recession so far and its starting to grate....
got work past xmas but like LPAD its bitty
LLL
-
- Posts: 1951
- Joined: Sat Dec 06, 2008 10:28 pm
- Location: Preston, Lancashire
-
- Posts: 144
- Joined: Sat Jan 08, 2011 2:48 pm
- Location: Stockport
1. Increases in govt borrowing/spending
2. Increases in commercial borrowing/spending
3. Increases in mortgage equity withdrawl and subsequent spending.
Take just one of these out of every year, whilst leaving the other two in, and the UK economy has been in recession every year since 2001.
We have all been the benficiaries of a credit fueled splurge.
It's now time to pay up, so........bend over.
2. Increases in commercial borrowing/spending
3. Increases in mortgage equity withdrawl and subsequent spending.
Take just one of these out of every year, whilst leaving the other two in, and the UK economy has been in recession every year since 2001.
We have all been the benficiaries of a credit fueled splurge.
It's now time to pay up, so........bend over.
-
- Posts: 186
- Joined: Thu Jul 01, 2010 6:50 pm
- Location: manchester
Yeah, starting to get sparse now.
Not really had a day of for years, even in the past few years of recession. But now im starting to worry a little. Got the next 2 weeks booked up, then got 2 weeks of bits and pieces to do, days here and there.
After that, nothing on the cards, hoping the firm I generaly contract to will come up with something, they usualy do, but they too have never been this quiet before.
Id like to think next year will start to pick up for everyone, but I just cant see it!
JD
Not really had a day of for years, even in the past few years of recession. But now im starting to worry a little. Got the next 2 weeks booked up, then got 2 weeks of bits and pieces to do, days here and there.
After that, nothing on the cards, hoping the firm I generaly contract to will come up with something, they usualy do, but they too have never been this quiet before.
Id like to think next year will start to pick up for everyone, but I just cant see it!
JD
A tidy job is a happy job.
-
- Posts: 481
- Joined: Wed Aug 17, 2005 11:55 pm
- Location: glasgow
Was entered into an "auction" for work today with a main contractor who'm i had tendered for a contract in May this year.he proceeded to tell me the figure he was willing to award me the contract.
5 mins later i worked out that my profit margin on the 20k job, at the price he wanted, was £90.
i called him back and said i was unable to meet his price,but was able to do it for x amont at my 15% margin.
no suprise,when he said sorry mate,we've another contractor able to meet our figure.
waste of time quoting for these boys-better to throw their tender docs in the bin. even if your stupid enough to meet their valuation,they still won't pay you for 6+ months.
otherwise its been a reasonable year for us,even accounting for 10k losses due to bad debtors who went bust on us.
it means i've reversed the last 2 years of losses into a surplus and am still alive.
however the last two weeks have seen the phone stop ringing and although we have work to xmas,we're currently looking like we'll be scratching around jan/feb,as per usual.
the dream would be to shut the doors at xmas,lie on a beach in tenerife and come back end feb/early march to resume trading.
unfortunately having 12 employees,many with 20+ years of service make this a tricky imposition.
5 mins later i worked out that my profit margin on the 20k job, at the price he wanted, was £90.
i called him back and said i was unable to meet his price,but was able to do it for x amont at my 15% margin.
no suprise,when he said sorry mate,we've another contractor able to meet our figure.
waste of time quoting for these boys-better to throw their tender docs in the bin. even if your stupid enough to meet their valuation,they still won't pay you for 6+ months.
otherwise its been a reasonable year for us,even accounting for 10k losses due to bad debtors who went bust on us.
it means i've reversed the last 2 years of losses into a surplus and am still alive.
however the last two weeks have seen the phone stop ringing and although we have work to xmas,we're currently looking like we'll be scratching around jan/feb,as per usual.
the dream would be to shut the doors at xmas,lie on a beach in tenerife and come back end feb/early march to resume trading.
unfortunately having 12 employees,many with 20+ years of service make this a tricky imposition.