Posted: Thu Oct 31, 2013 7:37 pm
by mickg
what man hole cover
Posted: Thu Oct 31, 2013 7:42 pm
by dig dug dan
Exactly. Took me a while to see it, then I noticed two.
Posted: Thu Oct 31, 2013 8:22 pm
by lutonlagerlout
looks like wallpaper dempsey
cant ask for more than that
did you use white cement to lay the granite?
cheers LLL
Posted: Thu Oct 31, 2013 8:29 pm
by mickg
Ashley did you use an external grout to point the granite or a resin based product ?
Posted: Thu Oct 31, 2013 10:03 pm
by DempseyLiverpool
Thanks for the comments everyone . Not pointed yet, using easipoint when we get a dry spell !!
Laid on 100mm mersey grit / opc, 4/1 semi dry mix, but did slurry with white cement/sbr.
No staining or picture framing to be seen.
Cheers
Posted: Fri Nov 01, 2013 3:45 pm
by lutonlagerlout
more adaptions for wheelchair access
we left 80mm from finish and had 60 and 20 hopefully as per dave L's spec
cheers LLL
Posted: Fri Nov 01, 2013 8:00 pm
by dig dug dan
why does it need the concrete edges set in?
Posted: Fri Nov 01, 2013 8:13 pm
by lutonlagerlout
it was my decision as the fire department wanted a 1500 square level platform outside the fire door
by putting the edgings in we eliminated the risk of the platform getting rolled out
all falls are to 1:12 which was the mandatory legal requirement
doctors surgery are over the moon with it
the alternative was a 1500 ramp with hand rails which would have caused grief for cars turning
LLL
Posted: Fri Nov 01, 2013 8:15 pm
by dig dug dan
makes perfect sense now. far better than the concrete and rails!
Posted: Fri Nov 01, 2013 8:19 pm
by mike builder/landscaper
Did you do the black waterproofing to the brickwork as a damp proof barrier tony?
Posted: Fri Nov 01, 2013 8:23 pm
by mickg
nice job but why the single drainage channel ?
Posted: Sat Nov 02, 2013 6:41 am
by Dave_L
Nice job Tone, I'd do the same with the edgers, takes the risk element away from it levels-wise.
Posted: Sat Nov 02, 2013 8:23 am
by lutonlagerlout
hi mike
building control asked for 3 coast of blackjack up to dpc so we complied
mick its hard to see on the pic but the water pools just there,obviously with a ramp there it would make it worse so we agreed on 1 channel
I told the doctors to keep off it till monday dave,do you reckon thats long enough?
cheers LLL
Posted: Sun Nov 03, 2013 9:10 am
by Dave_L
Yeah that'll be absolutely fine Tony.
Posted: Sun Nov 03, 2013 11:57 am
by Tony McC
A dab of cold-pour or overbanding where the new meets the existing is the only thing I'd do differently.