Page 197 of 315

Posted: Sat Jun 01, 2013 7:24 am
by lutonlagerlout
the black gold relaxes my muscles
each to their own eh?
LLL

Posted: Sat Jun 01, 2013 7:49 am
by michaelthegardener
got on with fixing my pond last weekend Image Image
base was 120mm thick Image
Image
Image
done for now :) then I started on the other pond
Image
Image

Posted: Sat Jun 01, 2013 9:08 pm
by GB_Groundworks
I'm liking our 350mm pulvex blade the only thing is makes a hideous high pitch whistling on the floor saw enough on a long cut job to give you a cracking headache

Posted: Sat Jun 01, 2013 9:27 pm
by dig dug dan
Looks like you have your work cut out there michael!

Posted: Sun Jun 02, 2013 6:57 am
by lutonlagerlout
hardcore you know the score michael :;):
keep up the good work
LLL

Posted: Sun Jun 02, 2013 12:49 pm
by Bob_A
Take it all out and have a swimming pool I say :)

Posted: Sun Jun 02, 2013 5:45 pm
by TheRockConcreting
lutonlagerlout wrote:hardcore you know the score michael :;):
anybody got any veras, lovely

Posted: Tue Jun 04, 2013 10:06 pm
by GB_Groundworks
fun job today before i go away in the morning

remove 20-40mm off a concrete slab over about 20m2 in total

Image

Image

Image

Posted: Tue Jun 04, 2013 10:21 pm
by Dave_L
That hanging hydraulic hose!! Planing concrete, hard going! Watch out for rebar that has floated up to the surface or the surface has worn away - one sure way to loose your pecks :(

Posted: Tue Jun 04, 2013 10:46 pm
by lutonlagerlout
Strange, that looks like that slab you cast about 6 weeks ago giles?

somebody have an after thought?

have a good trip

LLL :)

Posted: Tue Jun 04, 2013 11:21 pm
by London Stone Paving
Looks a bit dusty in there giles, hope you had the mask on mate:)

Posted: Tue Jun 04, 2013 11:56 pm
by GB_Groundworks
No in the wet mix area about quarter of a mile from new slab

Those small hose just do the side to side shift tighten on lowering

It was more screed than concrete planer minced through it

Robot was steer on joysticks bucket lift on one pedal bucket crown on the other pedal, wasn't a fan of the pedals prefer it all on the joysticks

We couldn't use water as the resin floor lads wanted to prime today, had full head respirator like all guys in there due to all the powders

We are on a 4 day ISO10800 compliance so hse are in whole site, full cdm rules and everyone of high alert.




Edited By GB_Groundworks on 1370386747

Posted: Wed Jun 05, 2013 6:04 am
by cookiewales
tuesdays work lovely weather 25m2 http://www.youtube.com/watch?v=eTcrj_OHzP0 Image :D



Edited By cookiewales on 1370409127

Posted: Wed Jun 05, 2013 6:36 am
by haggistini
Are you coming out of that corner Bruce??? ;-)

Posted: Thu Jun 06, 2013 6:22 am
by cookiewales
cracking day laying the setts getting to the corner hag its 40 liner meters now 5m2 a course :D http://www.youtube.com/watch?v=bfmvhh4THsw&feature=youtu.be