Page 14 of 14
Posted: Thu Sep 01, 2011 9:05 pm
by Carberry
Dave_L wrote:I shant even start to think of the cost of this job!
I reckon £3000 for the food.
Shame you haven't got a cherry picker or a helicopter to get a photo of the full job. Maybe send Haggis up on to the roof? :p
Posted: Thu Sep 01, 2011 9:11 pm
by haggistini
Ahhhhhhhh NO!
Posted: Thu Sep 01, 2011 9:48 pm
by London Stone Paving
Posted: Sat Sep 17, 2011 9:59 am
by ambient
do the setts stick down easily or do you use sbr only asking because weve got a load of sawn stone setts to lay but only 40mm thick
Posted: Sat Sep 17, 2011 11:59 am
by lutonlagerlout
i have laid the 40 mm ones straight onto a screed type mix and bashed them down maybe 30 mm with the mallet
they were solid the next day,pointed with easipoint day after
LLL
Posted: Sat Sep 17, 2011 4:34 pm
by haggistini
As above but sett in with a 2.5lb lump hammer and a 10mm gap all pointed with GTFK 800 epoxy pointing. These setts were 50mm thick anything thinner and you could pour some SBR and cement mix in to your prepared bed before laying them for peace of mind.