Posted: Wed Jul 11, 2012 11:02 pm
by Thepinkpavingco
Image
Doesn't look like we have done a lot but no one ever appreciates the groundworkers :(

Posted: Wed Jul 11, 2012 11:27 pm
by lutonlagerlout
nice work
why the telescopic vents so long?
I wish our groundworkers were as neat as you lot :;):
did anyone get the black man's pinch doing the blocks between the beams?

LLL

Posted: Thu Jul 12, 2012 6:28 am
by mickg
nice detail with the driveway Danny and nice job with the foundation too

Posted: Thu Jul 12, 2012 9:03 am
by Thepinkpavingco
Cheers mick

Posted: Thu Jul 12, 2012 7:06 pm
by dig dug dan
New job started Monday. rip out old clay paving base and slab patio, build 5m x 5m base with circle, lay 6" reinforced concrete pad, then lay patio slabs, all for a summerhouse!

Day one:
Image
Image
Image
Image
Image

Day2:
Image
Image
Image



do your worst guys :angry:




Edited By dig dug dan on 1342116552

Posted: Thu Jul 12, 2012 7:08 pm
by dig dug dan
day 3
Image
Image
Image
Image

recognize the bricks tony :D ???

Sadly no pics of the concrete pour today, battery went in the camera!




Edited By dig dug dan on 1342116570

Posted: Thu Jul 12, 2012 7:19 pm
by lutonlagerlout
nice bricks dan !!
i wonder where they came from
you did very well in 3 days
we had to cover brickwork 7 times yesterday due to sudden showers
PITA
today was a nice day,got scaffold high but no pics as banging the bricks down
i would have thought more like a week for that job if pricing,but looks like the slabs etc came up easy :)
happy days
LLL

Posted: Thu Jul 12, 2012 7:32 pm
by msh paving
As a moderator off this site,i cannot condone pix of concrete crushers without the approved safety system as supplied buy TCP Ltd,also jacked up on bricks, no eye protection, but i note the wearing off gloves,
So there you have it Daniel :D :D :D

MSH :)

Posted: Thu Jul 12, 2012 8:15 pm
by dig dug dan
i think also the safety inlet gate was removed too!

1pm concrete pour booked today, turned up at 4.40! left the site at 6.30, but luckily dumper soon made short work of bringing the concrete round.
back mid august for slabs.

Posted: Thu Jul 12, 2012 8:32 pm
by msh paving
dig dug dan wrote:i think also the safety inlet gate was removed too!
Glad to hear it..... :D :D mine jumped out off hopper too,so did the safety rope.... :D MSH :)

Posted: Thu Jul 12, 2012 9:22 pm
by rab1
mark, you forgot the revelent task specific risk/meathod statement. :;):

Posted: Thu Jul 12, 2012 10:38 pm
by London Stone Paving
We've gone risk assesment crazy down at London Stone. Since moving to our new HQ I have had to carry out approx 30 risk assesemnt's, most of the stuff is common sense but it has definately raised the standards of H&S at our place.

Nice work there Dan. Its really good to see stuff being reused on site. Our crusher was going great guns until the last couple of weeks. The belt has started to slip to the right before eventually jamming. We've done a bit of welding on it today, so hopefully it should be sorted. Great machine though. We' started shifting the stuff at £5 per ton to get it moving. Then it all moved very quickly, so gonna put it up to £10 per ton and see how it goes. The local pikies are going crazy for it :D

Posted: Fri Jul 13, 2012 1:20 am
by mickg
nice detail with the semi circle Dan

Posted: Fri Jul 13, 2012 7:00 pm
by haggistini
£5 a ton Steve? it must be getting right under your feet .. Nice job dan BTW will the semi circle be cut in situ or do you have a cicle to fit?

Internal drainage in ground floor

Image

Image

Image

You can't beat hand dig eh LLL !

Relocated convayor only 100T to come out now! And the scaffold has started in courtyard.

Image

Image

Posted: Fri Jul 13, 2012 9:19 pm
by lutonlagerlout
i love them sort of jobs haggis :)
we did similar on the french embassy in kensington palace gardens 20 years ago,lads with diamond chainsaws were cutting in damp course 450mm into existing walls ,never seen anything like it before or after
back to reality
earlier in the week
do you reckon my mate has the monday blues? :;):
Image

had to make a connection 1200 down an existing drain,what a ballbreaker hanging down the IC to point
Image

the scene this afternoon at 3.45
Image

went past the ramp we did before xmas
the lady died the day after it was completed RIP and it looks like the pikeys have nicked the handrail :angry:

and lastly followed this noddy out of a builders yard in luton
look carefully and you can see a pack of roofing batten sticking out of his passenger window at least 1200
it would be funny if it wasnt so sad
he nearly decapitated a group of schoolchildren when he swerved to avoid a bus
Image
dickhead

LLL :)