Page 2 of 2

Posted: Fri Jan 25, 2013 7:33 pm
by lutonlagerlout
brilliant,morrisons told me they always trench,never mole gas
bottom line putting new supplies in soon racks up the cost
LLL

Posted: Sat Jan 26, 2013 11:24 am
by remus
They had to dig in the main road because of a 6" water main in the way. Then they used 6m * 64mm pipes and moled them in. A hole at the end of our parking space and by the meter cab then moled two 32mm between. I was quite pleased with the price, all the water did for a lot more was connect our pipes to the main via meters.