haha i know all about hand digging, put a 40 metre footing in the other week by hand in 3 days on my own as the laborer ducked after day 1 haha but there is a 200mm thick 3mx5m slab to come out and theres no way i'm breaking that up with a jack hammer get the krupp on the mini any day of the week.mickg wrote:blimey GB in the good old days before mini diggers and tracked dumpers everything was dug by hard and moved in wheel barrows....
but hey thats when men were men and put a good hard days graft in
Narrow access jobs
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com