lay terram over the excavated ground, lay 150mm crushed concrete or type one, compacted to levels.
Then lay the clay pavers on a mortar bed,(3-1 soft sand+ cement) jointing them as you go.
Hugely time consuming, but your brickie should be able to cope
Posted: Mon Feb 07, 2011 5:51 pm
by haggistini
if thats the look you want i would dig out at least 200mm lay 100mm type 1 mot lay your edges (RSJ :p ) and lay the paviours as setts on a semi dry bed and consolidate every one to a string line then romex it all but if you going to this much trouble buy some setts instead
Posted: Mon Feb 07, 2011 5:52 pm
by ilovesettsonmondays
lay 100mm to 150mm of type1 or semi dry concrete . compact with whacker to correct levels. lay pavers on sand and cement screed or mortaR(your choice). point up as you go or at end . (your choice).
Posted: Mon Feb 07, 2011 6:53 pm
by GB_Groundworks
For a pedestrian Patio 100mm of sub base is more than enough,
Posted: Mon Feb 07, 2011 7:27 pm
by Mikey_C
could the op lay the blocks on a dryish cement/sand mix to the correct levels then joint with a slurry mortar such as cempoint or romex etc.
Posted: Mon Feb 07, 2011 7:34 pm
by ilovesettsonmondays
suggested above
Posted: Mon Feb 07, 2011 9:12 pm
by cookiewales
ilovesettsonmondays wrote:suggested above