Building up levels

Patio flagstones (slabs), concrete flags, stone flags including yorkstone and imported flagstones.
Post Reply
GaryN
Posts: 66
Joined: Mon Sep 29, 2003 4:07 pm
Location: Colchester, essex

Post: # 9751Post GaryN

Hi Tony,
I use a 6 sharp sand to 1 cement wet mix when laying slabs.
In the past, when I've had to build up levels to prevent this bed being too deep, and when I've had no sub base material on site, I've built up the level using a damp 10 sharp sand to 1 cement mix which I've trampled down by foot.
Is this accepatable and if so what's the maximum depth this 10 to 1 mix can be?
Regards
Gary

Tony McC
Site Admin
Posts: 8346
Joined: Mon Jul 05, 2004 7:27 pm
Location: Warrington, People's Republic of South Lancashire
Contact:

Post: # 9762Post Tony McC

The maximum thickness of any build-up layer is determined by how well it can be compacted. If you were using a granular sub-base or fill material, then typical compaction equipment such as a vibrating plate or a roller, can consolidate to a depth of around 200mm, but 150mm is a safer limit. With cementitious material, such as your 10:1 mix or a concrete, consolidation or 'compaction to refusal' isn't as critical as the cement will hydrate and harden the material even if it isn't fully compacted. However, any cementitious material is far better, from a structural point of view, when properly compacted, so again, I'd say that you should try to use layers of not more than 150mm depth, ensuring each layer is fully consolidated before placing the next.

The final bedding layer, whether it is cement-bound or clean sand, should never be more than 50mm depth.
Site Agent - Pavingexpert

GaryN
Posts: 66
Joined: Mon Sep 29, 2003 4:07 pm
Location: Colchester, essex

Post: # 9806Post GaryN

Thanks Tony,
Am I right in thinking there's no need to wait for the build up layer to set before laying the bedding layer and laying slabs?
Regards
Gary

Tony McC
Site Admin
Posts: 8346
Joined: Mon Jul 05, 2004 7:27 pm
Location: Warrington, People's Republic of South Lancashire
Contact:

Post: # 9839Post Tony McC

Correct - as long as it's well compacted, you can start laying immediately.
Site Agent - Pavingexpert

GaryN
Posts: 66
Joined: Mon Sep 29, 2003 4:07 pm
Location: Colchester, essex

Post: # 9852Post GaryN

Thanks Tony
Regards
Gary