Type 1 mot - Re-using

All forms of block paving, brick paving, flexible or rigid, concrete or clays, new construction or renovation
Post Reply
Daren
Posts: 2
Joined: Thu Apr 17, 2014 6:56 am
Location: edinburgh

Post: # 98461Post Daren

Can someone confirm please if when lifting an old driveway to discover a very decent base of type 1 underneath is re-usable and can generally be topped up with a little more type 1. Thanks

Carberry
Posts: 1366
Joined: Fri Apr 15, 2011 9:05 pm
Location: Edinburgh

Post: # 98465Post Carberry

I would check how the old driveway looked (if it had sunk anywhere then there is a possibility that the sub base was no good) and I would dig a few test holes to make sure it had the correct depth everywhere before reusing.

Tony McC
Site Admin
Posts: 8346
Joined: Mon Jul 05, 2004 7:27 pm
Location: Warrington, People's Republic of South Lancashire
Contact:

Post: # 98469Post Tony McC

Generally, as long as it's sound, not sunk, not overly contaminated with crap, and at a suitable level, then go for it!
Site Agent - Pavingexpert

Nigel Walker
Posts: 190
Joined: Sun Aug 22, 2004 7:28 pm
Location: Cumbria
Contact:

Post: # 98490Post Nigel Walker

Its a great perk of the job when you are excavating and find that there is a good quality, good depth of sub base under the drive.
When we price we always include for digging down to minimum 250mm and then minimum 160mm of type 1.

So finding a good sub base already there means less spoil away and less stone in. This equals very happy contractor :)
I always dig down and check the depth and quality. If sub base is only75-100mm thick, we scrape off, store to one side, excavate and then in-fill with the reclaimed sub base

Occasionaly, you get the client asking for some money knocked off because we haven't dug out as much as the quote said. My reply is - would you be willing to pay more if I had to dig deeper, have more waste and in-fill with more sub base. Their answer is always NO.
Its swings and roundabouts. Some jobs cost you a little more when you have to dig out an extra 20 ton of waste and in-fill with an extra 20 ton of type 1 and some jobs you make a bit more money on when you find a good base.

I know which one I prefer :D

dig dug dan
Posts: 2504
Joined: Thu Jul 10, 2003 10:20 pm
Location: hemel hempstead,herts. 01442 212315

Post: # 98494Post dig dug dan

ccasionaly, you get the client asking for some money knocked off because we haven't dug out as much as the quote said. My reply is - would you be willing to pay more if I had to dig deeper, have more waste and in-fill with more sub base. Their answer is always NO.
Its swings and roundabouts. Some jobs cost you a little more when you have to dig out an extra 20 ton of waste and in-fill with an extra 20 ton of type 1 and some jobs you make a bit more money on when you find a good base.

I know which one I prefer :D


had the same thing when i only need two grab loads out instead of four, and the customer expected a £500 rebate.
I have stopped itemising things now as i have even had someone count the number of gravel boards i used on a fence and knocked one off the bill as it was one less than quoted :angry:
Dan the Crusher Man
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 98501Post Dave_L

Indeed, be wary how much you detail on your quotations.........you can end up stitching yourself up unwittingly.
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

Daren
Posts: 2
Joined: Thu Apr 17, 2014 6:56 am
Location: edinburgh

Post: # 98506Post Daren

Yeah I very rarely itemise anything, ended up the hardcore wasnt nearly deep enough and was slightly contaminated so ended up replacing the lot. Was just curious as we have always jist took it out but sometimes its absolutely fine. Cheers

msh paving
Site Admin
Posts: 1854
Joined: Tue Aug 19, 2008 7:03 pm
Location: kings lynn norfolk
Contact:

Post: # 98509Post msh paving

Unless they supply a detailed spec.I put very little spec on apart from liner m for fences or pipe lines m2 for patio driveway, that way they have little to ask for rebate, MSH :)
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk

sy76uk
Posts: 791
Joined: Wed Feb 05, 2014 7:50 pm
Location: leicester

Post: # 98510Post sy76uk

I can't see the point in slinging a load of MOT just to have to buy a load of MOT but if I do find a good sub base I knock some off the bill.

Tony McC
Site Admin
Posts: 8346
Joined: Mon Jul 05, 2004 7:27 pm
Location: Warrington, People's Republic of South Lancashire
Contact:

Post: # 98563Post Tony McC

Nigel Walker wrote:Occasionaly, you get the client asking for some money knocked off because we haven't dug out as much as the quote said
My response to this was usually that, while I could credit them for the reduced excavation and sub-base supply, but then I'd have to increase the rate per cubic metre or tonne because I was dealing with much smaller quantities and couldn't achieve the same keen prices due to economies of scale.

If we could avoid any sub-base work whatsoever, so not even any regulating, I would credit them a small amount, never, IIRC, more than 50%, but if I had to get involved in re-profiling, regulating or replacing sections where drainage had been installed, then that would be charged as an EO
Site Agent - Pavingexpert