I'll be starting my driveway project next week and would like some advice on laying an edging course please.
From what I can gather the edging course is laid after the sub-base has been compacted. However, drawings of edging courses show the concrete bed as deeper than the top of the sub-base layer. Does this mean I need to dig out some of the sub-base to lay the concrete bed?
Thanks in advance for any help.
Ben.
Edging course
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 791
- Joined: Wed Feb 05, 2014 7:50 pm
- Location: leicester
All depends what you mean by edging course. If you mean long concrete edgings or kerbs then like LLL I'll lay them before installing the sub base.
If I'm not using edgings or kerbs then I'll install the sub base first and lay the border on semi dry sand and cement, rake away any surplus mot from outside of the border and haunch with wet concrete.
If I'm not using edgings or kerbs then I'll install the sub base first and lay the border on semi dry sand and cement, rake away any surplus mot from outside of the border and haunch with wet concrete.
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
A lot depends on the state of the subsoil and what depth you have to dig out, also how long your drive is and is it viable to use just concrete. You might have to build the ground up with a capping layer before you begin the road formation. Just aim to make the concrete bed 150 of concrete whichever way you attack it.
sean
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
This has come up a few times over the years and what seems obvious to me is obviously not obvious to civilians, so I'll try to find the time to clarify it in the Laying Edge Courses section.
You could lay edge courses prioer to installation of final sub-base, or you could place initial layer of sub-base, then install edge courses before topping-up sub-base, or, if the sub-base is done and dusted, you simply scrape out a shallow channel to accommodate the concrete bed.
Hopefully, that makes it all a bit more obvious.
You could lay edge courses prioer to installation of final sub-base, or you could place initial layer of sub-base, then install edge courses before topping-up sub-base, or, if the sub-base is done and dusted, you simply scrape out a shallow channel to accommodate the concrete bed.
Hopefully, that makes it all a bit more obvious.
Site Agent - Pavingexpert