use steel pins knocked into the ground at both ends of the area to be paved and a taught line fixed to the pins set 2 - 3mm higher than the finished height of the paving, lay out the screed rails parallel to the line and approx 50mm to one side
put your foot on the rail to hold in place and using it as a guide drag a taper mouth spade down the edge of the rail forming a channel in the compacted sand which the rail will fit into
using a paving block as a guide for the height lift or lower the rail into position using the block on top of the rail so it just touches the line, you need to push sand under the rest of the rail to give it support so when you commence screeding it cant dip when you add any weight during the screeding process
continue the same process with the second row of screed rails making sure the width is not wider than the aluminium or timber your using to screed the sand, I always allow 100mm minimum each side
you may have to use additional lines to check for any cross falls but this is something to be checked on site as every job is different
put your foot on the rail to hold in place and using it as a guide drag a taper mouth spade down the edge of the rail forming a channel in the compacted sand which the rail will fit into
using a paving block as a guide for the height lift or lower the rail into position using the block on top of the rail so it just touches the line, you need to push sand under the rest of the rail to give it support so when you commence screeding it cant dip when you add any weight during the screeding process
continue the same process with the second row of screed rails making sure the width is not wider than the aluminium or timber your using to screed the sand, I always allow 100mm minimum each side
you may have to use additional lines to check for any cross falls but this is something to be checked on site as every job is different
Crystalclear
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
-
- Posts: 2598
- Joined: Wed Apr 08, 2009 8:01 am
- Location: Peoples Republic of Westhoughton
- Contact:
I use 18mm hollow galvanised tube the type what electricians used to use for commercial type ducting
Crystalclear
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
-
- Posts: 2598
- Joined: Wed Apr 08, 2009 8:01 am
- Location: Peoples Republic of Westhoughton
- Contact:
right with you, no I use a aluminium feather edge screed similar to this link
I have 3 different lengths from 1 metre long up to 3 metre long
http://www.ebay.co.uk/itm....0487150
I have 3 different lengths from 1 metre long up to 3 metre long
http://www.ebay.co.uk/itm....0487150
Crystalclear
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
I use the same tube and straightedge as mickg
with the straight edge you can kind of cut excess sand away as you go
we normally install the stone 75mm down from finish then wack
then grit sand 30mm down from finish and wack
then screed to final levels 45mm down from finish
lay blocks
wack
then kds and wack again
LLL
with the straight edge you can kind of cut excess sand away as you go
we normally install the stone 75mm down from finish then wack
then grit sand 30mm down from finish and wack
then screed to final levels 45mm down from finish
lay blocks
wack
then kds and wack again
LLL
-
- Posts: 2598
- Joined: Wed Apr 08, 2009 8:01 am
- Location: Peoples Republic of Westhoughton
- Contact:
Yeah the feather edge digs into the sand as you pull it towards you making it easier to screen the sand, the alternative is a piece of 4x2 timber what is heavier and has a square edge which is as much use as a chocolate fire guard
Crystalclear
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Site Admin
- Posts: 1854
- Joined: Tue Aug 19, 2008 7:03 pm
- Location: kings lynn norfolk
- Contact:
Probst easyscreed, everytime not on your knees,stand up and pull adustable from 2.3-3m.smaller version .6, 1.2 and 1.6 cover almost everyjob no wet knees,short ally screed for tiny bits or a float MSH
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk
http://mshpaving.co.uk
-
- Posts: 31
- Joined: Sun Nov 03, 2013 2:12 am
- Location: Perth WA
will have a look at getting some of those. never screed with timber been using a concreters bar recently. would something like this do the trick?
http://www.ebay.com.au/itm....&_uhb=1
http://www.ebay.com.au/itm....&_uhb=1