I've had a search for this so apologies if it's covered elsewhere (I couldn't find anything)

We live on an unadopted lane and over the years the surface has been topped up (potholes and the like) with road scrapings.

Now it's been decided that we need drainage, as the lane is on an incline, before we make any more repairs as when it rains, the rainwater runs down the lane taking any loose material with it and then the cars do the rest of the damage in splashing the rest into the middle.

Talks are ongoing between the neighbours but the bottom line is that we need some sort of cost effective drainage putting in.

We will all have to put together to pay for this and, naturally, have a finite amount of funds to do so, even though we are happy to undertake some, if not all, of the physical graft ourselves.

Can anyone help/advise on this matter please?

many thanks in advance

bobbi o
Posts: 481
Joined: Wed Aug 17, 2005 11:55 pm
Location: glasgow

Post: # 92778Post bobbi o

Difficult without pics.

Ideally the road should have a camber, with possibly a filter drain running down the verges and discharging into a soakaway

If this is not possible, you could construct some "speed bumps", placed at an angle diverting the water to the sides of the road and preventing it from running down the centre.

whatever you do, you must divert the water to the sides of the road.

ATK60
Posts: 9
Joined: Sun Sep 29, 2013 1:29 pm
Location: Oldhan

Post: # 92780Post ATK60

Thanks for the reply bobbi.
I like the idea of the 'speed bumps' to divert rainwater.

The road drops off sharply at the side where we want the water to run off so I don't think a soak away is practical.

I hear what you are saying about the camber and that makes a lot of sense. Problem is, the rain starts to work itself a little gully, (least resistance and all that) and before long it's created a little 'stream' effect which just creates ever deeper ruts.

GB_Groundworks
Site Admin
Posts: 4420
Joined: Sat Aug 09, 2008 3:55 pm
Location: high peak
Contact:

Post: # 92781Post GB_Groundworks

we live up an unadopted lane up a steep hill. we have ditches on both sides and regular crossing made of kerbs set with a 2 inch upstand and concrete or kerb trough

ill find a picture....


heres one from a flat track

Image

Image

Image

on hills more of an angle across the lane




Edited By GB_Groundworks on 1380492466
Giles

Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.

http://www.gbgroundworks.com

ATK60
Posts: 9
Joined: Sun Sep 29, 2013 1:29 pm
Location: Oldhan

Post: # 92787Post ATK60

Excellent pics GB. I take it this method works just fine for you?
Where did you source the long edging that's set into the lane?

The trough off the edge, can you give me a bit more detail as to why you did this rather than just letting the rainwater run off the side? I'm guessing it was to keep erosion to a minimum, but where does it end up once it's in the trough?

Also, what spacing did you use when setting the edgings in to the lane, how far apart and what was the reasoning?

Hope you don't mind the questions. :)
Brilliant idea though

GB_Groundworks
Site Admin
Posts: 4420
Joined: Sat Aug 09, 2008 3:55 pm
Location: high peak
Contact:

Post: # 92794Post GB_Groundworks

They are standard 900mm long road kerbs

The gulley allows better drainage and makes it lot easier to shovel off the grit and stuff that will build up against the lip. You can either concrete a channel in front or lay kerbs flat against the upright kerb. Ill get a pic to show you what I mean.

The trough goes into the silt trap then was connecting into a land drain that drained into a river in this case, on our lane they just discharge into the ditch that runs along the lane

Spacing depends on how bad the water is on our hill it's bad they are where the water accumulates kind of put in ad hoc but every 500 yards say

You can vary the height of the upstanding depending on steepness or traffic

Ps where abouts in Oldham are you? We were in uppermill Thursday Friday and hopefully be back up there soon for slope remediation job




Edited By GB_Groundworks on 1380537339
Giles

Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.

http://www.gbgroundworks.com

ATK60
Posts: 9
Joined: Sun Sep 29, 2013 1:29 pm
Location: Oldhan

Post: # 92796Post ATK60

Have any of the edgings been compromised/broken by the traffic?
The Bin vehicles can get down our lane (just) and I can't help but wonder how long before we start to see chipped top edges.

What's your experience?

I understand what you mean about the trough (concrete or slab) I would imagine concrete would give a better solution.
Was the wood just used for shuttering and removed or did you leave it in situ?

ATK60
Posts: 9
Joined: Sun Sep 29, 2013 1:29 pm
Location: Oldhan

Post: # 92797Post ATK60

Ps where abouts in Oldham are you? We were in uppermill Thursday Friday and hopefully be back up there soon for slope remediation job


We are in Springhead, only a few miles from Uppermill.

GB_Groundworks
Site Admin
Posts: 4420
Joined: Sat Aug 09, 2008 3:55 pm
Location: high peak
Contact:

Post: # 92800Post GB_Groundworks

Ours suffer our 16 ton metal tracked excavators over them albeit we put timber rd them but they are road kerbs they're pretty tough though


Timber was just a shutter

Ill find those pics

Image

kerbs laid top to top to form a channel drain

Image

Image




Edited By GB_Groundworks on 1380569614
Giles

Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.

http://www.gbgroundworks.com

ATK60
Posts: 9
Joined: Sun Sep 29, 2013 1:29 pm
Location: Oldhan

Post: # 92804Post ATK60

That makes for a very tidy finish. Are they mortared down?

Had a read and answered my own question: On a bed of concrete. I take it those in the picture are what they call 'half battered' I know that refers to the 'slope' on the kerb but it's more likely to be how I'd feel after trying to shift one or two!

Have you used both types on your lane?

GB_Groundworks
Site Admin
Posts: 4420
Joined: Sat Aug 09, 2008 3:55 pm
Location: high peak
Contact:

Post: # 92805Post GB_Groundworks

Yeah both types as its evolved over the years even some less effective asphalt sleeping police
Giles

Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.

http://www.gbgroundworks.com

ATK60
Posts: 9
Joined: Sun Sep 29, 2013 1:29 pm
Location: Oldhan

Post: # 92806Post ATK60

So, in your view, which is the best of the two types pictured?
Personally I can see the merits in both but I think I prefer the latter. It looks the part and I can see it being effective.

If you were doing the 2nd type on our lane, say, what sort of cost per installation would we be looking at?

GB_Groundworks
Site Admin
Posts: 4420
Joined: Sat Aug 09, 2008 3:55 pm
Location: high peak
Contact:

Post: # 92808Post GB_Groundworks

The later looks better and drives over better but only handles small run off its soon over whelmed the first handles a lot more water but you have to bump over it
Giles

Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.

http://www.gbgroundworks.com

stephen gibson
Posts: 21
Joined: Wed Jul 03, 2013 10:45 pm
Location: Abingdon, UK
Contact:

Post: # 92829Post stephen gibson

The cheapest solution would be to employ a civil engineering consultant to assist you with getting the road adopted. Then all the cost of repairs and drainage will be your local highway authorities.
Stephen Gibson
Civil Engineering Consultant
Opinion provided in personal capacity.

Please don't hesitate to contact if you require any professional advice independent to contractors / manufacturer.
http://www.wilsham.co.uk

ATK60
Posts: 9
Joined: Sun Sep 29, 2013 1:29 pm
Location: Oldhan

Post: # 92832Post ATK60

Its a nice idea Stephen but is it really that simple? The council won't even give us a grit bin!