Hi there I have a job to do and I no I can do the work but have prob with the maths wise off it but I have a 60 square meter of slabs to lay and how I work it out:
3 ton of sand
2 tone of ballest
20 cerment
Put the ballest down and waker plate it down then put some sand down then mix some cerment up with the sand its for the back garden and it use as easy to pick up dog foul
Was ratio do u use as I have ask loads of ppl and they tell me all diffrent but I would use 4 sand and 2 cerment is that rite
Many thanks dale
Paving - How much
-
- Posts: 1
- Joined: Thu Jul 18, 2013 3:24 pm
- Location: dalesgardeningservices
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
dale you really need to have a good read of this
the reason nobody has answered is because the technique you describe is all wrong
for 60m2 of slabs i would spec
dig out 150mm
install 10 tonne of type 1 and wack to refusal
lay slabs on a 6:1 grit sand : cement mix
4 tonnes of sand and 20 cement needed
you would need 2, 6 yard skips to do it my way
good luck
LLL
the reason nobody has answered is because the technique you describe is all wrong
for 60m2 of slabs i would spec
dig out 150mm
install 10 tonne of type 1 and wack to refusal
lay slabs on a 6:1 grit sand : cement mix
4 tonnes of sand and 20 cement needed
you would need 2, 6 yard skips to do it my way
good luck