Hi, wonder if anyone can advise me please. I have had work done in the garden 40m of fencing, relevel my garden, and 100 extra patio slabs around the existing patio. The problem I have now is the slabs he layed are coming loose, its only been 4 weeks.
The original patio has been down for 2.5 years and only 1 loose?.
He removed some garden with a machine to accomodate the extra patio slabs, and has layed the slabs using a five point method.
Can anyone tell me if the method he used will result in my new slabs all coming loose?
The original patio has been down for 2.5 years and only 1 loose?.
He removed some garden with a machine to accomodate the extra patio slabs, and has layed the slabs using a five point method.
Can anyone tell me if the method he used will result in my new slabs all coming loose?
-
- Posts: 4
- Joined: Thu Jul 18, 2013 11:12 am
- Location: wales
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 916
- Joined: Thu Aug 07, 2008 8:31 pm
click for how to load picturesoverthebridge wrote:Hi thanks for reply .how do I add a pic on here?
-
- Posts: 4
- Joined: Thu Jul 18, 2013 11:12 am
- Location: wales
Hi im lost with the pic hererimexboy wrote:overthebridge wrote:Hi thanks for reply .how do I add a pic on here?
click for how to load pictures
http://www.ultimatehandyman.co.uk/forum1/patio-t67066.html
not sure if I can put this up, but was able to get pic on there
Thanks
-
- Posts: 916
- Joined: Thu Aug 07, 2008 8:31 pm
yer that works ok ...
as tony says its no good...
you need to give the contractor the opportunity to correct it... im afraid, write to him and ask him to write back stating what he is going to do to put it right...
I can see from that link you have had him back and from that picture its no good ....
in simple terms it all needs redoing properly with a proper sub base and a full bed of mortar...
put this to him and see what he says,
as tony says its no good...
you need to give the contractor the opportunity to correct it... im afraid, write to him and ask him to write back stating what he is going to do to put it right...
I can see from that link you have had him back and from that picture its no good ....
in simple terms it all needs redoing properly with a proper sub base and a full bed of mortar...
put this to him and see what he says,
-
- Posts: 4
- Joined: Thu Jul 18, 2013 11:12 am
- Location: wales
Yes thanks for that.He said he will call next week, but we will see ???rimexboy wrote:yer that works ok ...
as tony says its no good...
you need to give the contractor the opportunity to correct it... im afraid, write to him and ask him to write back stating what he is going to do to put it right...
I can see from that link you have had him back and from that picture its no good ....
in simple terms it all needs redoing properly with a proper sub base and a full bed of mortar...
put this to him and see what he says,
-
- Posts: 916
- Joined: Thu Aug 07, 2008 8:31 pm
you need to do it in writing that way you have proof you have asked, should you need it at a latter date .... such as court claims!!overthebridge wrote:rimexboy wrote:yer that works ok ...
as tony says its no good...
you need to give the contractor the opportunity to correct it... im afraid, write to him and ask him to write back stating what he is going to do to put it right...
I can see from that link you have had him back and from that picture its no good ....
in simple terms it all needs redoing properly with a proper sub base and a full bed of mortar...
put this to him and see what he says,
Yes thanks for that.He said he will call next week, but we will see ???
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire