Recent work
-
- Posts: 1270
- Joined: Mon Aug 10, 2009 8:30 am
- Location: york work anywhere where the stone takes me
- Contact:
-
- Posts: 2598
- Joined: Wed Apr 08, 2009 8:01 am
- Location: Peoples Republic of Westhoughton
- Contact:
do you reckon it was cost effective to crush what looks like 5 ton of MOT ?
Crystalclear
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
another pile at the bottom of the garden mick
I reckon 10 tonne in total
plus minus 2 skips
our grab man wont take any rubbish anymore just mud and hardcore, last lot of rubbish cost him £600 to tip
its not always economic but i reckon on this job it has saved me a few quid
the biggest thing you need is space to do the crushing
cheers LLL
I reckon 10 tonne in total
plus minus 2 skips
our grab man wont take any rubbish anymore just mud and hardcore, last lot of rubbish cost him £600 to tip
its not always economic but i reckon on this job it has saved me a few quid
the biggest thing you need is space to do the crushing
cheers LLL
-
- Posts: 2598
- Joined: Wed Apr 08, 2009 8:01 am
- Location: Peoples Republic of Westhoughton
- Contact:
OK cool
did the guy wearing the shades have to break the 450 x 450 flags into bite size pieces or will the crusher work with the flags that size ?
did the guy wearing the shades have to break the 450 x 450 flags into bite size pieces or will the crusher work with the flags that size ?
Crystalclear
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
looking great cookie and tony, back from usa and canada but straight back to it knocking walls out at factory 6metres wide x 8 metres high 9 inch english bond in imperial cheshire's worked everyday since landing on thursday
got loads of photos of paving rekated stuff from us but will take me a bit of time
poured 50m3 today into footings for big new build
starting a horse arena next week, and busy at the factory taken on a new guy im so busy
photos to follow
got loads of photos of paving rekated stuff from us but will take me a bit of time
poured 50m3 today into footings for big new build
starting a horse arena next week, and busy at the factory taken on a new guy im so busy
photos to follow
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
-
- Posts: 169
- Joined: Wed Nov 28, 2012 4:26 pm
- Location: Cambridgeshire
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
if it was higher we would have used *L* bars Jay
we started backfilling with the crush today and the wall is only retaining around 350-500 mm max
there will be a 225mm upstand around the patio
we filled up all the blocks with concrete as well today
so 400 wide by 500 deep concrete footing with that lot on top I would be surprised if it moved
a lot of flags turned up today ,bit of shaping up tomoz and probably start laying friday
LLL
we started backfilling with the crush today and the wall is only retaining around 350-500 mm max
there will be a 225mm upstand around the patio
we filled up all the blocks with concrete as well today
so 400 wide by 500 deep concrete footing with that lot on top I would be surprised if it moved
a lot of flags turned up today ,bit of shaping up tomoz and probably start laying friday
LLL
-
- Posts: 2504
- Joined: Thu Jul 10, 2003 10:20 pm
- Location: hemel hempstead,herts. 01442 212315
How come you jointed up those blocks tony. Are they going to be seen?
Dan the Crusher Man
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire