Hi everyone, I'm a complete layman and am thankful for any constructive advice upfront.
We have asked a landscaper to lay a new patio for our back garden using slabs. A few days ago he dug up the old turf and slabs, and yesterday he laid the cement and about 3/4 of the slabs. (pictures below)
I'm now very concerned because of two issues:
1) I can see a hump in the middle of the patio which means that it slopes back to the house, and we haven't asked for nor did he suggest any drainage.
2) it is only 100mm below the damp proof course, and from my basic research it should be at least 150mm.
It is a new build house, less than 2 years old. We have been quoted £2000 for the job but we haven't paid anything up front.
Before and after pictures below:
[img]http://s7.postimg.org/h8uklkw....mg]
I suppose the crux of my thread is:
- are these two issues serious, and if so I would appreciate your advice on how I should go about resolving them, if it's even possible!
We have asked a landscaper to lay a new patio for our back garden using slabs. A few days ago he dug up the old turf and slabs, and yesterday he laid the cement and about 3/4 of the slabs. (pictures below)
I'm now very concerned because of two issues:
1) I can see a hump in the middle of the patio which means that it slopes back to the house, and we haven't asked for nor did he suggest any drainage.
2) it is only 100mm below the damp proof course, and from my basic research it should be at least 150mm.
It is a new build house, less than 2 years old. We have been quoted £2000 for the job but we haven't paid anything up front.
Before and after pictures below:
[img]http://s7.postimg.org/h8uklkw....mg]
I suppose the crux of my thread is:
- are these two issues serious, and if so I would appreciate your advice on how I should go about resolving them, if it's even possible!
-
- Posts: 345
- Joined: Tue Aug 07, 2007 9:23 pm
- Location: Hereford
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
see here for further advice
LLL
sorry but that is one of the WORST patios I have ever seen
up it comes
LLL
sorry but that is one of the WORST patios I have ever seen
up it comes
-
- Posts: 62
- Joined: Thu Jun 06, 2013 2:12 pm
- Location: Oxfordshire
I can comment on the dump course question, as had to investigate it myself when did my project. the 150mm while desirable, can be waved in some applications. take a look here http://www.pavingexpert.com/dpc01.htm and scroll to the title "Bending The Rules". I've checked out the regulations they referenced in this article and it appears that it is ok. It is also more acceptable if your slabs do not come directly to the wall, but have a little "dry gap", the one in my patio filled with shingles - provides nessesary drainage.
~Lana~
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 2598
- Joined: Wed Apr 08, 2009 8:01 am
- Location: Peoples Republic of Westhoughton
- Contact:
stop the work from continuing any further is the next step, then you need to sit down with the person who has laid this mess and explain why you will not let the work continue and finally you need to find another contractor
Crystalclear
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
-
- Posts: 62
- Joined: Thu Jun 06, 2013 2:12 pm
- Location: Oxfordshire
-
- Posts: 12
- Joined: Tue Jun 25, 2013 6:06 pm
- Location: Norfolk
-
- Posts: 12
- Joined: Tue Jun 25, 2013 6:06 pm
- Location: Norfolk
lana wrote:I would ask him to... to remove the slabs and go and then find another someone to lay them properly?
Did you pay for the materials already?
Is it possible to remove the slabs from the cement without damaging the slabs?
Yes, we paid for the slabs and a deposit for the cement but nothing else so far.