Laying sharp sand advice needed

All forms of block paving, brick paving, flexible or rigid, concrete or clays, new construction or renovation
DazzaSt
Posts: 28
Joined: Sun Jun 02, 2013 8:07 pm
Location: London

Post: # 90756Post DazzaSt

Hi All,

I dug down between 4" to 6" and then created a slightly deeper trench for my soldier course. These will be cemented so that the top of these blocks is level with that of the lawn (ignore how crooked they look in the picture below).

I'll be ordering a ton of sharp sand today and wanted to know without a vibrating plate what is the best method of laying down the sharp sand and compacting it? The top of the blocks will lie level with the top of the soldier course when completed (hopefully!)

Also, is it necessary to fill the area with sharp sand first before compacting?

Cheers
Daz
Image

rab1
Posts: 1869
Joined: Sun Jun 07, 2009 10:19 pm
Location: scotland

Post: # 90757Post rab1

Please save up £200 and do it right.
God loves a tryer

TheRockConcreting
Posts: 169
Joined: Wed Nov 28, 2012 4:26 pm
Location: Cambridgeshire

Post: # 90758Post TheRockConcreting

is someone paying you to make this mess?
Jay Johnston

The Rock Concreting Ltd
Cambridgeshire, UK

DazzaSt
Posts: 28
Joined: Sun Jun 02, 2013 8:07 pm
Location: London

Post: # 90760Post DazzaSt

Be nice. I'm trying!

rimexboy
Posts: 916
Joined: Thu Aug 07, 2008 8:31 pm

Post: # 90763Post rimexboy

They are trying to say you are not doing it correct have you had a look on the block paving page on the main site??

I'm just like you a DIYer but I would say you need to go deeper use MOT TYPE 1 then compact then sand to lay the blocks on then compact them with sand between the joints...

But as a DIYer I would be asking if block paving is any good next to a pool... Sand washing out of joints and so on....

Have a good read on the main site all the info is on it
Click this for block
paving


Also is that rain water in the hole or a leak from the pool I suspect??

DazzaSt
Posts: 28
Joined: Sun Jun 02, 2013 8:07 pm
Location: London

Post: # 90764Post DazzaSt

I know it's not correct but I've got no time to do a correct job due to a party in a couple of weeks and can only work on it during the weekend. If I had the time I'd be laying MOT 1, etc. but for time and budget reasons have to stick to sand then blocks. If it can last two seasons then I'll be happy. I'll then remove the blocks and do it properly.

rab1
Posts: 1869
Joined: Sun Jun 07, 2009 10:19 pm
Location: scotland

Post: # 90765Post rab1

using a correct sub base etc this will take less than an afternoon...
God loves a tryer

rimexboy
Posts: 916
Joined: Thu Aug 07, 2008 8:31 pm

Post: # 90766Post rimexboy

The sand and ground will just sink, you are just wasting your time

Bob_A
Posts: 861
Joined: Wed Feb 27, 2008 9:30 pm
Location: SE London/ NW Kent

Post: # 90767Post Bob_A

I'm also a diyer and I understand where you are coming from but you've come to the wrong site to ask these sort of questions.
The site is called Paving Expert and the regulars on here are professionals who only do things the proper way and have a reputation to keep which may be damaged if they give out shoddy advice.

If I were you I'd do it the best you can for now, have the party, enjoy the summer and redo it properly when it fails but have more time.

loudog
Posts: 214
Joined: Wed Jan 02, 2008 12:59 pm
Location: mells

Post: # 90769Post loudog

if you are going to do this at least put a fabric down. its only foot traffic and not vehicles so i think it will be ok

DazzaSt
Posts: 28
Joined: Sun Jun 02, 2013 8:07 pm
Location: London

Post: # 90772Post DazzaSt

cheers

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 90775Post lutonlagerlout

if you are going to make a bollix of it daz you may as well knock up dry lean mix 5:1 grit sand : cement screed it off and lay your blocks on that
do the edging courses first with concrete ,let that go off for 24 hours then screed and lay
only screed as much as you can lay in the time frame
a proper bodge but thats what you are after :;):
LLL
"what,you want paying today??"

YOUR TEXT GOES HERE

mickg
Posts: 2598
Joined: Wed Apr 08, 2009 8:01 am
Location: Peoples Republic of Westhoughton
Contact:

Post: # 90784Post mickg

you don't need a vibrating plate just lay it down rough and walk it in with your feet, screed it off rough and lay the pavers any cuts you can make with a hammer and bolster then mix cement and water to make a slurry to fill in the joints don't bother to clean off any surplus as it won't matter its only temporary

job done - next

PS..... don't bother posting photos of the finished paving as no one is interested

note to self
why bother giving professional advice when people don't listen
???
Crystalclear
Driveway and Patio Installer

Call us today
01942 840109
7 days a week 8am till 8pm

Driveways Patios and Paving Specialists
Driveways

seanandruby
Site Admin
Posts: 4713
Joined: Mon Jun 26, 2006 11:01 am
Location: eastbourne

Post: # 90789Post seanandruby

mickg wrote:you don't need a vibrating plate just lay it down rough and walk it in with your feet, screed it off rough and lay the pavers any cuts you can make with a hammer and bolster then mix cement and water to make a slurry to fill in the joints don't bother to clean off any surplus as it won't matter its only temporary

job done - next

PS..... don't bother posting photos of the finished paving as no one is interested

note to self
why bother giving professional advice when people don't listen
???
come on mick, that's not fair. We will all be interested to see what a feck up he's made, then can transfer it to the craic and o c d thread :;): :laugh:
sean

London Stone Paving
Posts: 2199
Joined: Mon May 10, 2010 1:07 pm
Location: Surrey
Contact:

Post: # 90792Post London Stone Paving

Cmon guys give Dazza a break. Were supposed to be educating people about the right way to do things and even if Dazza is ignoring the correct advice lets at least keep it professional.

Dazza, it will take you no time at all to dig out some soil and put an MOT down. It does not go dark till 10pm, you could do it over 2 evenings after work.

Think how annoying it will be when it all sinks and you have to take all the blocks up and the sand up and then do it properly. A bit more effort now (the cost of a bit of MOT) and you can get it done right first time