Sumps
-
- Posts: 1568
- Joined: Mon May 10, 2010 9:58 pm
- Location: Gatwick
- Contact:
-
- Posts: 37
- Joined: Sat Apr 16, 2011 8:04 pm
- Location: Midlands
-
- Posts: 1071
- Joined: Sat Aug 22, 2009 8:57 pm
- Location: essex
-
- Site Admin
- Posts: 4732
- Joined: Fri Jul 28, 2006 8:47 pm
- Location: Somerset
- Contact:
Pre-formed road gulley plastic former would be cheaper/quicker, surrounded by concrete?
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset
See what we get up to Our Facebook page
See what we get up to Our Facebook page
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
loads of options, you can buy preformed ones but expensive, as has been said lots of things work
we did one last week 5 4" dense block in a slab to act as the pit then broke them out, or ive set carver boxes full of sand in as a shutter before then concreted round them,
we did one last week 5 4" dense block in a slab to act as the pit then broke them out, or ive set carver boxes full of sand in as a shutter before then concreted round them,
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
-
- Posts: 1568
- Joined: Mon May 10, 2010 9:58 pm
- Location: Gatwick
- Contact:
-
- Posts: 1071
- Joined: Sat Aug 22, 2009 8:57 pm
- Location: essex
-
- Posts: 1951
- Joined: Sat Dec 06, 2008 10:28 pm
- Location: Preston, Lancashire
I had one made by express plastics, all they did was chop a chunk off a 600mm twinwall solid drainage pipe, plastic weld a bottom onit and then core two holes out and weld some spigots on, cost about 100 quid i think
Edit...thinking about it, i think it was more, but it was the cheapest option by far
Edit...thinking about it, i think it was more, but it was the cheapest option by far