Hi guys,
thanks for all the great very useful information on this site.
I live in London and the soil in my garden is very "clayey". It also looks like I might be in a natural depression, as every time it rains my garden gets completely flooded, to shin height. This is localised to the back and thankfully near the house its not as bad - but still very waterlogged. I think i need herringbone land drainage as detailed in this website - draining into a rainwater gulley near the house.
There is a path running along the side of the house, which was covered in a layer of concrete. Water was collecting at the side of the house as the concrete had lifted slightly, forming a small permanent puddle against the wall whenever it rained.
So.. I lifted the path and now I need to re-lay one. Water does not drain freely through the clay, so i figure i need a linear drain along the length of the path, connecting into the rain gulley at the end ? Is this the right thing to do considering the clay soil, and the fact that it seems the water table is very high around the house ?
Also - considering the soil/water, should i have a certain type of stone for the path? I'm thinking 12" square york stone slabs with a red brick border to match the rest of the house.
Thanks in advance for your advice
thanks for all the great very useful information on this site.
I live in London and the soil in my garden is very "clayey". It also looks like I might be in a natural depression, as every time it rains my garden gets completely flooded, to shin height. This is localised to the back and thankfully near the house its not as bad - but still very waterlogged. I think i need herringbone land drainage as detailed in this website - draining into a rainwater gulley near the house.
There is a path running along the side of the house, which was covered in a layer of concrete. Water was collecting at the side of the house as the concrete had lifted slightly, forming a small permanent puddle against the wall whenever it rained.
So.. I lifted the path and now I need to re-lay one. Water does not drain freely through the clay, so i figure i need a linear drain along the length of the path, connecting into the rain gulley at the end ? Is this the right thing to do considering the clay soil, and the fact that it seems the water table is very high around the house ?
Also - considering the soil/water, should i have a certain type of stone for the path? I'm thinking 12" square york stone slabs with a red brick border to match the rest of the house.
Thanks in advance for your advice
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 420
- Joined: Mon Jun 29, 2009 11:14 pm
- Location: uk
-
- Posts: 5
- Joined: Mon Feb 25, 2013 10:16 am
- Location: London
-
- Posts: 1568
- Joined: Mon May 10, 2010 9:58 pm
- Location: Gatwick
- Contact:
-
- Posts: 5
- Joined: Mon Feb 25, 2013 10:16 am
- Location: London
-
- Posts: 1366
- Joined: Fri Apr 15, 2011 9:05 pm
- Location: Edinburgh
Depend on the hedge, how big it is and how big you're planning on letting it grow.Wetguylondon wrote:Thanks for the replies. The other side of the path is all hedges. Do I need some kind of membrane there between the roots and the hardcore ?
Is there someone who anyone can recommend to do this job - who can deal with the gully/drainage as well as the path laying ?
-
- Posts: 5
- Joined: Mon Feb 25, 2013 10:16 am
- Location: London
Thanks for all the replies so far guys.
I have had 3 different guys round to look at it, and have had 3 different solutions !!
i'll post some pictures below so you see what i'm talking about. The house is on a hill, so the ground on the hedge side is higher than the wall side, and water obviously comes onto the path from there.
here are what the different people said:
A: lay the flags over a concrete sub base, falling away from house, with linear drain right next to the house.
B: Lay the flags over type 1 / 50mm aggregate. Linear drain under the hedge, coming in to join the existing rainwater gulley at about 30 degrees angle
C: The path would only be 1 brick below the DPC, so have to lower the whole thing down, including the rainwater gulley. This would also involve a step at the beginning and end of the path (as the front driveway and patio are higher). Lay the flagstones over a concrete base falling away from house.
(this would mean that when I re-do the driveway and patio i'll have to lower them all too to match the path!)
I wish there was a bit more consistency. Any experts here have any thoughts ?
Thank you
I have had 3 different guys round to look at it, and have had 3 different solutions !!
i'll post some pictures below so you see what i'm talking about. The house is on a hill, so the ground on the hedge side is higher than the wall side, and water obviously comes onto the path from there.
here are what the different people said:
A: lay the flags over a concrete sub base, falling away from house, with linear drain right next to the house.
B: Lay the flags over type 1 / 50mm aggregate. Linear drain under the hedge, coming in to join the existing rainwater gulley at about 30 degrees angle
C: The path would only be 1 brick below the DPC, so have to lower the whole thing down, including the rainwater gulley. This would also involve a step at the beginning and end of the path (as the front driveway and patio are higher). Lay the flagstones over a concrete base falling away from house.
(this would mean that when I re-do the driveway and patio i'll have to lower them all too to match the path!)
I wish there was a bit more consistency. Any experts here have any thoughts ?
Thank you
-
- Posts: 5
- Joined: Mon Feb 25, 2013 10:16 am
- Location: London
-
- Posts: 7
- Joined: Mon Mar 04, 2013 10:51 am
- Location: Oxfordshire
-
- Posts: 7
- Joined: Mon Mar 04, 2013 10:51 am
- Location: Oxfordshire
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire