silly question mark, but how did you ensure that that manhole was flush with the surrounding ground. those rings are not easy to cut to size!!
Dan the Crusher Man
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"
-
- Site Admin
- Posts: 1854
- Joined: Tue Aug 19, 2008 7:03 pm
- Location: kings lynn norfolk
- Contact:
After a carefull math's the hole was 1100 deep,one ring 500mm second ring 250mm slab 150mm lid 45mm total 945mm sit ring on a bed to make upto leval, cut 2 dog kennels in opposite side 300x300 to straddle pipe concrete in side to hold penstock upright, simple's MSHdig dug dan wrote:silly question mark, but how did you ensure that that manhole was flush with the surrounding ground. those rings are not easy to cut to size!!
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk
http://mshpaving.co.uk
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Site Admin
- Posts: 4732
- Joined: Fri Jul 28, 2006 8:47 pm
- Location: Somerset
- Contact:
But the manhole cover as pictured isn't to final finished level....there should be a course or two of engineering brick to bring it up finial finish.
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset
See what we get up to Our Facebook page
See what we get up to Our Facebook page
-
- Site Admin
- Posts: 1854
- Joined: Tue Aug 19, 2008 7:03 pm
- Location: kings lynn norfolk
- Contact:
true dave, but as usual customer did no what to spend the money, they was happy with it,i was doing it for another guy,
its concreted in now and finished, it will make it easy to reach in and turn the penstock with no brickwork,well that my story anyway.....
MSH
its concreted in now and finished, it will make it easy to reach in and turn the penstock with no brickwork,well that my story anyway.....
MSH
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk
http://mshpaving.co.uk
-
- Posts: 1405
- Joined: Thu Sep 27, 2007 10:29 am
- Location: South Wales
- Contact:
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
so new job we started 540m2 slab, and footing for robots, and repair of another slab at ferrodo brake pad manufactures.
some other contractors been done the test holes left a mess
we had to refill the trenches in layers and trench ram took a day to get them all filled, then we had to get rid of all the plaster board they'd left so two days extra before we'd even started,
so 2 10 yard skips for the plaster board, everything has to be certificated and recycled, skips for wood, plastic, metal etc concrete staying on site for demolition contractor to crush when they sell off the other bit of factory, painters are working in other bit on the cherry pickers to we have to have springlers running to control dust
was still there at 9pm on thursday
full day breaking out on friday got about 400m2 done in a day 20 litres of diesel burnt not bad going
we had to build some gates as well each side is 1.5m x 3m
got about 300 tons of concrete to get out, got the 3 ton dumper might get the 6 ton but takes half a day to move it and door way is only 3mx3m of a single width rd between sheds. got a 400 yard run to the tip
brought the 8 ton up to help shift the crete, trying to talk the old man into a 5 or 8 ton kubota but he aint having it yet
gotta strip the concrete then proof roll subgrade with sheeps foot roller then 200mm slab going back in
its a full cdm site so full hi viz hard hat, goggles, ear buds or defenders gloves etc all times on site, out area is off limits to anyone but us.
nice and warm in the sheds though gotta be 20 degrees
Edited By GB_Groundworks on 1360619023
some other contractors been done the test holes left a mess
we had to refill the trenches in layers and trench ram took a day to get them all filled, then we had to get rid of all the plaster board they'd left so two days extra before we'd even started,
so 2 10 yard skips for the plaster board, everything has to be certificated and recycled, skips for wood, plastic, metal etc concrete staying on site for demolition contractor to crush when they sell off the other bit of factory, painters are working in other bit on the cherry pickers to we have to have springlers running to control dust
was still there at 9pm on thursday
full day breaking out on friday got about 400m2 done in a day 20 litres of diesel burnt not bad going
we had to build some gates as well each side is 1.5m x 3m
got about 300 tons of concrete to get out, got the 3 ton dumper might get the 6 ton but takes half a day to move it and door way is only 3mx3m of a single width rd between sheds. got a 400 yard run to the tip
brought the 8 ton up to help shift the crete, trying to talk the old man into a 5 or 8 ton kubota but he aint having it yet
gotta strip the concrete then proof roll subgrade with sheeps foot roller then 200mm slab going back in
its a full cdm site so full hi viz hard hat, goggles, ear buds or defenders gloves etc all times on site, out area is off limits to anyone but us.
nice and warm in the sheds though gotta be 20 degrees
Edited By GB_Groundworks on 1360619023
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
-
- Posts: 1951
- Joined: Sat Dec 06, 2008 10:28 pm
- Location: Preston, Lancashire
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 1951
- Joined: Sat Dec 06, 2008 10:28 pm
- Location: Preston, Lancashire
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire