Weiss ft plus on the dreaded black limestone - Second coat advice needed
-
- Posts: 2199
- Joined: Mon May 10, 2010 1:07 pm
- Location: Surrey
- Contact:
-
- Posts: 2598
- Joined: Wed Apr 08, 2009 8:01 am
- Location: Peoples Republic of Westhoughton
- Contact:
if you sealing prior to laying how do you transport the paving to site without marking the surface ?
Crystalclear
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
-
- Posts: 2199
- Joined: Mon May 10, 2010 1:07 pm
- Location: Surrey
- Contact:
It's just a case of giving it enough time to dry and then re-packing it on to pallets. It's taken a little time to get it right but we've got a good method now.mickg wrote:if you sealing prior to laying how do you transport the paving to site without marking the surface ?
The stone is unpacked and then cleaned. It's then left to dry or dried with large blow torches. We then apply the 2 coats of seal and let it dry for 24 hours. The only time we have had issues with stone marking is when it's been packaged before being properly dry.