brilliant,morrisons told me they always trench,never mole gas
bottom line putting new supplies in soon racks up the cost
LLL
Electric heating - Off topic
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 51
- Joined: Mon Jan 10, 2005 7:30 pm
- Location: Rochester,Kent
They had to dig in the main road because of a 6" water main in the way. Then they used 6m * 64mm pipes and moled them in. A hole at the end of our parking space and by the meter cab then moled two 32mm between. I was quite pleased with the price, all the water did for a lot more was connect our pipes to the main via meters.
Kevin