Biggest (?) uk resin bound project - Shepherd's bush green

Setts and cobbles, tarmac, asphalt, resin systems, concrete whether it's plain, patterned or stencilled, gravels, etc.
Post Reply
simeonronacrete
Posts: 373
Joined: Tue Feb 18, 2003 3:11 pm
Location: Essex
Contact:

Post: # 85334Post simeonronacrete

Simeon Osen
Ronacrete Ltd - http://www.ronacrete.co.uk
Tel: +44 (0) 1279 638 700
Follow us at http://www.twitter.com/Ronacrete

bobbi o
Posts: 481
Joined: Wed Aug 17, 2005 11:55 pm
Location: glasgow

Post: # 85338Post bobbi o

what was the spec for the base that this was laid on ?

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 85351Post lutonlagerlout

nice work simeon
I know that area well from football
LLL
"what,you want paying today??"

YOUR TEXT GOES HERE

simeonronacrete
Posts: 373
Joined: Tue Feb 18, 2003 3:11 pm
Location: Essex
Contact:

Post: # 85376Post simeonronacrete

The base was tarmacadam; not sure of the specifics but I'm happy to check up and let you know in the New Year.
Simeon Osen
Ronacrete Ltd - http://www.ronacrete.co.uk
Tel: +44 (0) 1279 638 700
Follow us at http://www.twitter.com/Ronacrete

bobbi o
Posts: 481
Joined: Wed Aug 17, 2005 11:55 pm
Location: glasgow

Post: # 85379Post bobbi o

Yeah would appreciate that.

we've had problem in the past with the resin (not yours) delaminating from the asphalt/tarmac

would like to know the specific bituminous material used for a big un like this.

Tony McC
Site Admin
Posts: 8346
Joined: Mon Jul 05, 2004 7:27 pm
Location: Warrington, People's Republic of South Lancashire
Contact:

Post: # 85398Post Tony McC

That's a bloody good question, bobbi o. What's the latest thinking when it comes to overcoming the risk of de-bonding? I've not seen anywhere near as many 'blisters' over the last couple of years, so is that because the weatther has never been warm enough to be a problem, or have there been improvements with the resins?
Site Agent - Pavingexpert

simeonronacrete
Posts: 373
Joined: Tue Feb 18, 2003 3:11 pm
Location: Essex
Contact:

Post: # 85408Post simeonronacrete

Resin blistering from the surface is a problem associated with resin BONDED. This job was resin BOUND.

Our standard substrate spec for footpaths is

"Construction of base
For pedestrian traffic
From base upwards, construction is typically 50-100mm of well compacted non-frost susceptible Type 1 sub-base to DoT Clause 803, followed by 40mm of 14mm close graded asphalt macadam surface wearing course to BS 4987 Part 2: 2001 Clause 7.3 which has been laid to a fall of not less than 1% to allow for good drainage and water run-off. The surface must be smooth and flat. Alternatively apply to sound well constructed and smooth concrete substrate. The base should be sound, clean and dry. New tarmac surfaces must be allowed to cool and gain strength for not less than 24 hours at 20oC. Ronacrete’s Technical Department will be pleased to discuss permeable substrates".
Simeon Osen
Ronacrete Ltd - http://www.ronacrete.co.uk
Tel: +44 (0) 1279 638 700
Follow us at http://www.twitter.com/Ronacrete

RAPressureWashing
Posts: 985
Joined: Wed Aug 15, 2007 3:02 pm
Location: Staines Surrey
Contact:

Post: # 85505Post RAPressureWashing

Have been watching that area gradually come together over the last year as we go past the "Green" many times on the way into central London, and noticed it was finished and Looks Very Good indeed, Nice work Simeon :cool: