On the setting out a herringbone pattern page, http://www.pavingexpert.com/howto45.htm
there is a diagram that shows setting the first blocks at 215mm for minimizing wastage. Why not cut the block through its center at a 45 degree to produce to equal halves? I am doing a path and planned to use the other half on the other edge and would not have any waste. The thing I do realize is that the chevron's would not be symetrical at the edges.
Herringbone cutting - Minimizing scrap
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
Not all projects have dimensions that suit equal cuts to each side: in fact, it would be the minority of jobs that work out that way.
Further, if you undercut the blocks as recommended, the off-cut "half" is larger at the base than at the surface, and so wouldn't give a tight joint at the edge.
Further, if you undercut the blocks as recommended, the off-cut "half" is larger at the base than at the surface, and so wouldn't give a tight joint at the edge.
Site Agent - Pavingexpert
-
- Posts: 3
- Joined: Tue May 31, 2005 4:07 am
- Location: Connecticut, USA
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
-
- Posts: 3
- Joined: Tue May 31, 2005 4:07 am
- Location: Connecticut, USA
10 foot sections run 12.00 usa dollars. I'll need to support about 270 feet for about 300.00$$ US. I'm emailing you some pics right now.Tony McC wrote:Nail down edging? Why? Are you not in UK/RoI? the "nail-down edgings" are unrealistically expensive over here.
Cutting with a diamond blade - you can cut right through if you wish, but the blocks will/should snap perfectlyt once the saw has cut to a depth of around 25mm.
Jeff Rozycki
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
10 feet sections (3 metres over here) cost roughly 15 quid (23 dollars) and you have to buy a minimum of arond 30 metres (100 feet). The ground pins, nails, spikes or whatever you want to call them, are extra.
One of our biggest manufacturers used to sell a branded version of a US system, but it never really caught on, and, compared to the concrete-bedded edge courses we typically use in Britain and Ireland, was far more expensive and more difficult to set-up. Since it was withdrawn from the market, other smaller companies have tried to introduce similar systems but sales remain minimal.
I'll keep my eye open for the photies - my email server is having a dicky fit at the mo', so I'm not sure if they've landed yet.
One of our biggest manufacturers used to sell a branded version of a US system, but it never really caught on, and, compared to the concrete-bedded edge courses we typically use in Britain and Ireland, was far more expensive and more difficult to set-up. Since it was withdrawn from the market, other smaller companies have tried to introduce similar systems but sales remain minimal.
I'll keep my eye open for the photies - my email server is having a dicky fit at the mo', so I'm not sure if they've landed yet.
Site Agent - Pavingexpert