Hi Guys,
I have had a bit of a busy weekend, tryng to get all the sub base whacked in.
However i am now a little concerned that i haven't got it quite level enough.
The drive has a bit of fall down to the road, and a bit of fall left ot right.
However i am now a little concerned i haven't got it spot on.
I tried to screed the type 1 down with a bit of 6 x2 , and filled the low spots and whacked them in, stretched a line from left to right with the mrs, filled it a bit whacked it a bit.
But i dont have a perfectly smooth plane.
I havent built my edges yet, so am wondering once i get my edges sorted that the final levelling is achieved, and a more accurate subbase level is achieved.
However does the sand blinding cover all this up and i am just worrying about nothing.
Cheers for any advice.
A
Getting a sub base level
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact: