Is it necessary to use SBR both in the mortar mix and as a bond bridge slurry? Could I get away with just the bond bridge?
I'm worried about its effect of reducing the working time of the mortar which, for a novice, might not help me. Though I do see the benefit the bond bridge will offer in ensuring a sound bed.
If I do add it to the mortar, the mix ratio states 2.5-5l per 25kgs cement. Does that mean per sand/cement mix, or per amount of cement added to the mix. The former means I'll need gallons of the stuff?!
Thanks!
Use of sbr
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire