Tendering for big jobs

Other groundworks tasks, such as roads and footpaths, terracing, fencing, foundations, walls and brickwork, tools and plant.
Post Reply
GB_Groundworks
Site Admin
Posts: 4420
Joined: Sat Aug 09, 2008 3:55 pm
Location: high peak
Contact:

Post: # 81909Post GB_Groundworks

how do you boys go about it, other than using a quantity surveyor that is, a builder we d work for is tendering for a big million pound build in prestbury, i have the tender and 20 pdfs of the plans, its a nightmare of a job half burried house.

tanking by approved specialist only, 10 yr guarantee on the tanking install... this is a nightmare

so how do you go about pricing big jobs, ive started to compartmentalise it from the demolition of the bungalow, site fencing, new footings, slabs, etc but then theres is all the super sleve drainage and levels to change etc.

then says price for everything but the paving which is tbc lol

its a lot easier when we buy a site and build a house and sell it lol

doing my head in trying to allow for all eventualities etc

looking like £80-£100k of work for us.
Giles

Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.

http://www.gbgroundworks.com

haggistini
Posts: 1405
Joined: Thu Sep 27, 2007 10:29 am
Location: South Wales
Contact:

Post: # 81910Post haggistini

You need a "good" QS Giles! they can make or break a job like that , but make sure they earn their money buy having a few site visits and discuss what is involved not just quantitys ,I am currently working on a tanking system it has base drains ,sumps,pumps and membranes to discharge water it's called a Newton system and we have a specialist firm doing the work. they also will need a few visits. Good luck btw!
http://www.G-Tech.co
Bespoke Paving Contractor
M:07944036174

Less yap yap more tap tap!

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 81911Post lutonlagerlout

break it down into segments giles
it can easy take 40-50 hrs to do jobs like that
I.E. clear site £25 p/m
reduce to formation level £90 per M 3
etc etc
then add up the quantities
LLL
"what,you want paying today??"

YOUR TEXT GOES HERE

GB_Groundworks
Site Admin
Posts: 4420
Joined: Sat Aug 09, 2008 3:55 pm
Location: high peak
Contact:

Post: # 81912Post GB_Groundworks

Haggi if we were tendering for the whole job we would but you are talking £500 etc

I'm reliant on my mate getting the rest of his tender right, to get the job

Bit of an awkward one, actually should be but more resilient price it but it's not a firm price as Groundworks always change, we've used fosroc systems before but this is a two layer torch one system from visqueen

Just gonna have to keep braking it down into easier parts
Giles

Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.

http://www.gbgroundworks.com

Pablo
Posts: 1990
Joined: Sun Mar 25, 2007 10:49 pm
Location: N/Ireland

Post: # 81914Post Pablo

I always break the quotes down regardless of the size of the job. What always surprises me is how much more I have to charge to even come close to the same percentage of profit that I'd get from a standard 1 week job. What always catches me is plant hire/ muck away and those unforseen purchases of £20 here and there to act as workarounds for something we've not thought would be a problem. I get caught on plant usually due to the weather if I've budgeted for 3 weeks hire and it rains meaning topsoil can't be moved etc then and you've had it for 4 days then there's a week gone already. I now include in quotes get out clauses like stating how many loads of soil in muck out etc we'll expect to use but if we use more then it'll cost £### per load in addition to the original quote. I sweeten it by saying the bill will also be reduced by however many loads we don't use this never happens though. Another thing I do is allow for several days of snagging and also cleaning once we've finished. Cleaning a large garden upon completion can sometimes take another week and is something clients wouldn't think about or expect to pay for.
You said yesterday big jobs are the way forward I would strongly disagree they're good for the ego and bragging about but usually terrible for the bank balance compared to the smaller in and out stuff which always turn a better percentage of profit. I'm pricing one right now I'm confident I'll get it but it'll probably be about £80000 and is zero vat rated I'll not make anywhere near what I want to make on it although I'll not get caught out either you just can't put that extra bit on no one except footballers and lottery winners will pay it just now.
Every project I do has an excell speadsheet where I work out what's been spent whats saved whats the tax and whats the bottom line. This helps me keep a handle on the pricing and also scares me into getting things done better.
Can't see it from my house

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 81924Post lutonlagerlout

i agree turnover for vanity ,profit for sanity
big jobs are nice for security,the 135 k extension last year kept us busy for 4 months,but there was around 105 profit at the end due to all the reasons pablo mentioned
if we do a 20m ramp for the council,we can make 25% profit in a week
but you need a lot lined up to keep the momentum
doing all sorts right now,got a months work but nothing big in the bag,a few priced have to wait and see
cheers LLL
"what,you want paying today??"

YOUR TEXT GOES HERE

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 81946Post Dave_L

I'm glad Pablo said what he said as that was exactly what I was thinking when I read the thread - big is most definitely not beautiful, infact I shy away from the big sub-contracting jobs - I can return far better profits from the £5k jobs than one £25/30k job, at far less risk too.
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

GB_Groundworks
Site Admin
Posts: 4420
Joined: Sat Aug 09, 2008 3:55 pm
Location: high peak
Contact:

Post: # 82198Post GB_Groundworks

spec says permeable indian stone hehe anyone seen this before?
Giles

Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.

http://www.gbgroundworks.com

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 82205Post Dave_L

Sounds like the QS/Architect is just outta college!
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

Carberry
Posts: 1366
Joined: Fri Apr 15, 2011 9:05 pm
Location: Edinburgh

Post: # 82208Post Carberry

All stone is permeable to do certain extent. I'm guessing when they say permeable though they want water to soak through it rather than run off it in which case you would need quite a porous sandstone. You wouldn't be able to seal it which isn't recommended for any very porous stone and you may have issues with strength and durability. Perhaps one of the more porous softer stones but cut to 40mm thick or something?

GB_Groundworks
Site Admin
Posts: 4420
Joined: Sat Aug 09, 2008 3:55 pm
Location: high peak
Contact:

Post: # 82244Post GB_Groundworks

I quoted for normal with polymeric

My bit of the tender is done, £58k of Groundworks

We'll see if my mate gets it
Giles

Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.

http://www.gbgroundworks.com

rab1
Posts: 1869
Joined: Sun Jun 07, 2009 10:19 pm
Location: scotland

Post: # 82282Post rab1

you or one of the other 2 contractors your mates qs asked to tender... ???.
God loves a tryer