Easyjoint on rainbow sandstone
-
- Posts: 2199
- Joined: Mon May 10, 2010 1:07 pm
- Location: Surrey
- Contact:
rainbow sandstone is very porous so you need to absolutely soak the patio prior to using easyjoint or any of the sweep in poitning compounds.
The point of soaking is that the paving becomes so waterlogged that it cant take in any more water, so it wont then absorb any of the resin from the easyjoint.
Easypoint will give a quick job but wont last as long as standard cement products
The point of soaking is that the paving becomes so waterlogged that it cant take in any more water, so it wont then absorb any of the resin from the easyjoint.
Easypoint will give a quick job but wont last as long as standard cement products
-
- Posts: 4
- Joined: Sat Jun 30, 2012 1:59 pm
- Location: UK
-
- Posts: 2199
- Joined: Mon May 10, 2010 1:07 pm
- Location: Surrey
- Contact:
If you are planning to seal I would always say that its best to seal before you lay. That way, its job done and you dont need to worry about it. Rainbow is very porous so you will need a fair wack of seal. Probarbly about 1 litre per 5m2 to get the job done properly.
Are you choosing rainbow because its cheap, or because you like the colour?
Are you choosing rainbow because its cheap, or because you like the colour?
-
- Posts: 4
- Joined: Sat Jun 30, 2012 1:59 pm
- Location: UK
Ha, we like the style of it -> http://www.flickr.com/photos/simplypaving/6841092959/lightbox/
Will go ahead with the sealing beforehand. Thanks again!
Will go ahead with the sealing beforehand. Thanks again!
-
- Posts: 2199
- Joined: Mon May 10, 2010 1:07 pm
- Location: Surrey
- Contact:
-
- Posts: 2199
- Joined: Mon May 10, 2010 1:07 pm
- Location: Surrey
- Contact: