Gravel pathway project - Advice required
-
- Posts: 9
- Joined: Tue Nov 08, 2011 12:53 pm
- Location: Aberdeen
Good afternoon, I am away to lay a new gravel garden path and am looking for some advice. So here goes;
The problem - My driveway requires to be widened to improve access down the side of my car for wife and two small children. The block driveway is not in great condition overall but funds dictate it will have to remain as is (therefore I shan't discuss it further).
https://picasaweb.google.com/1093316....ectlink
My Chosen Solution - Excavate a circa 1m wide trench down the length of the existing driveway to a depth of 100mm. 75mm of compacted DTp1 sub layer, 25mm of gravel. Retain granite cassie (sett) edging of drive and mirror this with new cassies on new path edge.
Dimensions - The section of path is 11m long. There are 50 cassies required to edge it. The cassies are 20mm x 15 x 10 roughly.
Things I need advice on
i) Existing drive edging - This has not been finished correctly in the past. The blocks had no concrete bed/haunching. I intend on re-using these and installing on a decent bed of concrete with haunch behind. Does this seem a reasonable approach? Do you compact in the sub layer first and then dig out to accommodate the required concrete depth?
ii) Depth to dig for path - The expert advice from the site is a depth of 100mm. I have dug a test hole and it is 350mm down to solid ground. Is it acceptable to only dig 100mm in this case when there is still soft soil, and do you just have to go over well with a Wacker?
iii) Membrane - any thoughts? I was not going to bother
Feel free to add any other advice you have. Thanks in advance
Based in Aberdeen if anyone close by wants a couple of hours consultancy fee!
The problem - My driveway requires to be widened to improve access down the side of my car for wife and two small children. The block driveway is not in great condition overall but funds dictate it will have to remain as is (therefore I shan't discuss it further).
https://picasaweb.google.com/1093316....ectlink
My Chosen Solution - Excavate a circa 1m wide trench down the length of the existing driveway to a depth of 100mm. 75mm of compacted DTp1 sub layer, 25mm of gravel. Retain granite cassie (sett) edging of drive and mirror this with new cassies on new path edge.
Dimensions - The section of path is 11m long. There are 50 cassies required to edge it. The cassies are 20mm x 15 x 10 roughly.
Things I need advice on
i) Existing drive edging - This has not been finished correctly in the past. The blocks had no concrete bed/haunching. I intend on re-using these and installing on a decent bed of concrete with haunch behind. Does this seem a reasonable approach? Do you compact in the sub layer first and then dig out to accommodate the required concrete depth?
ii) Depth to dig for path - The expert advice from the site is a depth of 100mm. I have dug a test hole and it is 350mm down to solid ground. Is it acceptable to only dig 100mm in this case when there is still soft soil, and do you just have to go over well with a Wacker?
iii) Membrane - any thoughts? I was not going to bother
Feel free to add any other advice you have. Thanks in advance
Based in Aberdeen if anyone close by wants a couple of hours consultancy fee!
-
- Posts: 661
- Joined: Mon Feb 21, 2005 11:54 am
- Location: Birmingham, west midlands, UK
- Contact:
Hi Mate. If your just making the path to walk on, then just excavate as you propose, re-set your drive edgings and hauch, fit your new edgings and haunch, then put your DTp1 in compact it, for the sake of 25mm I'd put in 100mm of sub-base, on top of membrane if you wish.
When you say you dug 350mm down to solid ground, what do you mean? From what I can see on your picture, the lawn looks pretty dried out to me, so I'd guess the ground is pretty firm. As long as your not sinking into the earth it should be stable enough for a path at 100/150mm depth.
When you say you dug 350mm down to solid ground, what do you mean? From what I can see on your picture, the lawn looks pretty dried out to me, so I'd guess the ground is pretty firm. As long as your not sinking into the earth it should be stable enough for a path at 100/150mm depth.
Gi it sum ommer
-
- Posts: 9
- Joined: Tue Nov 08, 2011 12:53 pm
- Location: Aberdeen
Hi, thanks for reply;
What I was getting at with the ground is that it used to be a flower bed down that side and it is a loose-ish soil and I wasn't sure if a path had to be dug down like a foundation until you reached harder ground, or whether 100mm was sufficient if you compacted the soil underneath.
The grass is a red herring, it is mostly moss and surprisingly for Aberdeen looks yellow due to some recent hot weather. It is not due to the underlying soil being compacted in any way.
Will heed the advice and go for a 100mm sub-base.
Cheers
What I was getting at with the ground is that it used to be a flower bed down that side and it is a loose-ish soil and I wasn't sure if a path had to be dug down like a foundation until you reached harder ground, or whether 100mm was sufficient if you compacted the soil underneath.
The grass is a red herring, it is mostly moss and surprisingly for Aberdeen looks yellow due to some recent hot weather. It is not due to the underlying soil being compacted in any way.
Will heed the advice and go for a 100mm sub-base.
Cheers
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
Dimensions - The section of path is 11m long. There are 50 cassies required to edge it. The cassies are 20mm x 15 x 10 roughly.
what are these cassies that are 20 by 15 by 10 mm?
i take it you mean 15 cm by 10 cm by 20mm thick?
very odd size
as mick has said if its just for walking on dig 150 mm lay new row of cassies put weed membrane inside and lay gravel on that
The existing looks ropey,i wouldnt touch it as it could be a can of worms
used to drink in the bobbin when visiting my cousins but sadly you are too far for a site visit
cheers LLL
-
- Posts: 9
- Joined: Tue Nov 08, 2011 12:53 pm
- Location: Aberdeen
-
- Posts: 9
- Joined: Tue Nov 08, 2011 12:53 pm
- Location: Aberdeen
Bought the house off an old biddie and I have a funny feeling there may have been an Irish influence to the work but I will never know... Having lifted the odd block there is not much underneath. A tidy up job will have to suffice for now. Got a quote from Roy Cowie (Gardener to the Queen at her Deeside Estate) who does things properly and nearly feinted. Things are not cheap up here.
The Bobbin is still going strong on King Street for the students, AFC are moving to a new stadium potentially so it will miss out on the matchday crowd.
Thanks again for all the advice
The Bobbin is still going strong on King Street for the students, AFC are moving to a new stadium potentially so it will miss out on the matchday crowd.
Thanks again for all the advice
-
- Posts: 9
- Joined: Tue Nov 08, 2011 12:53 pm
- Location: Aberdeen
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 9
- Joined: Tue Nov 08, 2011 12:53 pm
- Location: Aberdeen
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
-
- Posts: 9
- Joined: Tue Nov 08, 2011 12:53 pm
- Location: Aberdeen
S&R; I was going to use grit sand as ballast so will do as suggested and use half bag cement with full mixer. What thickness of bedding is required for the cassies? I will lay all the cassies with the semi dry mix and then mix up a wetter batch and go back and haunch all of them. Will the bedding and haunch merge OK being different mixes? Also what should I use for the joints between the cassies? Thanks
-
- Posts: 9
- Joined: Tue Nov 08, 2011 12:53 pm
- Location: Aberdeen
....also I can't get my head around something else. If you only dig out say 150mm depth for hardcore and gravel, but the edging cassie is 150mm deep and needs to sit on a bed of say 50mm semi dry mix, how does that work as you would need to excavate deeper than 150mm for the edge course. Is my thinking flawed, as I can't think how you would excavate a narrow channel a little deeper just for the edge course. Apologies if this is basic!
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
Dig it deep and throw it well back :;): :laugh:graniteman wrote:....also I can't get my head around something else. If you only dig out say 150mm depth for hardcore and gravel, but the edging cassie is 150mm deep and needs to sit on a bed of say 50mm semi dry mix, how does that work as you would need to excavate deeper than 150mm for the edge course. Is my thinking flawed, as I can't think how you would excavate a narrow channel a little deeper just for the edge course. Apologies if this is basic!
sean
-
- Posts: 9
- Joined: Tue Nov 08, 2011 12:53 pm
- Location: Aberdeen
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire