Replacing old block paved drive.
I have a drive which is about 16 years old that was block paved in a herringbone style then about 5years ago another section was added in basket weave. There has been no sign of movement but i want to replace the whole area with some new blocks to make the area look uniform. In total its only about 15m2 so we arent talking masses of paving here.
Can i just whip the blocks up, replace the edging and re haunch it then drop my new blocks in and do the cuts. Or do i need to rough up / replace the grit sand?
Can i just whip the blocks up, replace the edging and re haunch it then drop my new blocks in and do the cuts. Or do i need to rough up / replace the grit sand?
-
- Posts: 1568
- Joined: Mon May 10, 2010 9:58 pm
- Location: Gatwick
- Contact:
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
matt when you remove the old block all the gunk and kds will fall away this needs to be cleared from the bedding area
we did this in an area about 15m2 the other week but i forgot to take a picture
once the crap is removed we raked the original sand over (which had settle anyway and added 5-6 barrows of new sand wacked and screeded it to levels
dont be tempted to just try and top up the dips or lay straight on the old sand ,
cheers LLL
we did this in an area about 15m2 the other week but i forgot to take a picture
once the crap is removed we raked the original sand over (which had settle anyway and added 5-6 barrows of new sand wacked and screeded it to levels
dont be tempted to just try and top up the dips or lay straight on the old sand ,
cheers LLL
-
- Posts: 2598
- Joined: Wed Apr 08, 2009 8:01 am
- Location: Peoples Republic of Westhoughton
- Contact:
I agree with Luton, you cant just remove the old block and replace due to the dirt and the kiln dried sand off the old block getting mixed in with the sand laying course, all of this to be removed and add additional course sand if required and screed to the correct level or fall to disperse the surface water
the existing sand laying course will be too compacted to give any tolerance to bed the new paving down into it and you could crack the new paving blocks when you do the final compaction with the vibrating plate
the existing sand laying course will be too compacted to give any tolerance to bed the new paving down into it and you could crack the new paving blocks when you do the final compaction with the vibrating plate
Crystalclear
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
ive been and measured it and its 12.5m2.... best trade in my smart car for a roller skate. lol.
So if I do this:
1 Remove all old blocks
2 concrete new edgings in
3 Remove dirt and kiln sand and top inch or so of old bedding
4 Add new sharp sand and screed so blocks are 5mm higher than edging
5 Do the blocks
6 wacker the blocks
7 sand the joints
Will i have made any epic fails?
So if I do this:
1 Remove all old blocks
2 concrete new edgings in
3 Remove dirt and kiln sand and top inch or so of old bedding
4 Add new sharp sand and screed so blocks are 5mm higher than edging
5 Do the blocks
6 wacker the blocks
7 sand the joints
Will i have made any epic fails?
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire