Hi, once again, looking for some expert advice!!!

I'm doing a patio between two existing buidlings. I intend to build two retaining walls of about 450mm high between the buildings to form a rectangle of about 4m by 5m.

Have dug out down to solid ground.

I intend to lay wide random stonework onto well compacted limestone crusher run footings to form the retainers.

My questions:

1) I'll need about 10 cubic metres of compacted 'fill' material once the walls are up.

I'd planned to use limestone crusher 40-0 for this, but at 450 deep - thats going to mean a lot of limestone.....

Q: Can I put my topsoil back in and build up in well compacted layers and then top out with Limestone? (this will save on a skip and cut down on the limestone order)

2) I plan to top off with Indian sandstone paving on a full mortar bed..... is it acceptable to lay this directly onto the well compacted limestone?

Any advice much appreciated as always.

Cheers

Ade :D
Adrian Williams

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 78535Post lutonlagerlout

1 no it will subside
2 yes by limestone i take it you mean type1 MOT stone
built up in 100 mm layers,each one wacked thats fine
LLL
:)
"what,you want paying today??"

YOUR TEXT GOES HERE

Adrwilliams
Posts: 43
Joined: Tue Jun 07, 2011 8:57 pm
Location: Rotherham

Post: # 78639Post Adrwilliams

THanks LLL - yes - I did mean MOT 1 but I wasnt sure whether there was a limit to the depth I could build up?

If you had a void of the same dimensions 4m by 5m by 450mm deep - what method of fill would you use?

Is MOT1 the best option?

THanks again
Adrian Williams

Pablo
Posts: 1990
Joined: Sun Mar 25, 2007 10:49 pm
Location: N/Ireland

Post: # 78644Post Pablo

Yes it's your best option you'll be needing approx 14t. With regards digging down all you need to do is remove the topsoil nothing more then cover with a geotextile.
Can't see it from my house

Adrwilliams
Posts: 43
Joined: Tue Jun 07, 2011 8:57 pm
Location: Rotherham

Post: # 78982Post Adrwilliams

Thanks for the replies. I know which direction I'm heading in - feel much more confident about it now! Thanks again.
Adrian Williams

GB_Groundworks
Site Admin
Posts: 4420
Joined: Sat Aug 09, 2008 3:55 pm
Location: high peak
Contact:

Post: # 78987Post GB_Groundworks

I'd fill with cheaper crusher run then top off with mot,
Giles

Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.

http://www.gbgroundworks.com

DNgroundworks
Posts: 1951
Joined: Sat Dec 06, 2008 10:28 pm
Location: Preston, Lancashire

Post: # 78992Post DNgroundworks

What giles said, also crusher run footings, no concrete for a retaining wall?

Adrwilliams
Posts: 43
Joined: Tue Jun 07, 2011 8:57 pm
Location: Rotherham

Post: # 79405Post Adrwilliams

Thanks again for the replies.

I'd assumed that wideish retaining walls in random stone of minimal height, would be stable enough built onto well compacted limestone? After digging out, I found that the ground is very hard and stable, so I'm hoping to get away without concrete footings......

On the topic of Crusher run versus MOT 1, is there any reason why I shouldnt simply opt to use crusher run throughout? After all, if I compact it well enough with the wacker, is there really likely to be any issue?

Thanks again guys.
Adrian Williams

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 79408Post lutonlagerlout

Adrian as we share the same initials I will try and be helpful
1 concrete is relatively cheap,dont skimp use concrete for any wall foundations
2 crusher run is basically a skip been put through a crusher
better to use *CLEAN* hardcore in the lower levels ,wacked every 100mm and mot type 1 for the top 200mm
make sure there are no voids in the hardcore,fill these with type 1

cheers LLL :)