Granite slabs - Cost effective laying
-
- Posts: 6
- Joined: Wed Apr 04, 2012 2:05 pm
- Location: Cornwall
-
- Posts: 1990
- Joined: Sun Mar 25, 2007 10:49 pm
- Location: N/Ireland
You could either pour a slab and lay them like tiles or lay them on 40mm of mortar over a compacted stone base the latter will be cheaper material wise the former will be cheaper labour wise. Personally granite looks rubbish butt jointed thats what builders do to keep the costs down and it looks cheap and allows weeds to grow. A 3-5mm joint really lifts the paving and adds a real sense of class to it. Adding joints won't add much cost if you're doing the work yourself.
Edited By Pablo on 1336071552
Edited By Pablo on 1336071552
Can't see it from my house
-
- Posts: 6
- Joined: Wed Apr 04, 2012 2:05 pm
- Location: Cornwall
It's a bit over 70sqm altogether. I'm paying some builders to lay it who have done some serious groundwork and terracing. I've been trying to convince them that laying on grit or grit and cement is what architects specify on commercial jobs, but they are unconvinced. I appreciate completely that there are bullet proof methods, but what I'm after is the best compromise. I'm not planning to move house next week, so I don't want to spend a fiver now so I have to spend another ten later. I don't think there is enough depth to pour a slab, but that is an appealing idea.
-
- Posts: 1990
- Joined: Sun Mar 25, 2007 10:49 pm
- Location: N/Ireland
If you're spending the kind of money I think you're spending on 70m of granite then there should be no compromise whatsoever. Do it right that way you'll be proud of it rather thanl ook at it everyday and think you could've had a better job. What is the builder suggesting they should do. It shouldn't be laid on grit it'll fail so they are right to be sceptical.
Can't see it from my house
-
- Posts: 6
- Joined: Wed Apr 04, 2012 2:05 pm
- Location: Cornwall
I suspect I'm spending less than you think I am!
I've ordered this.
I've ordered this.
-
- Posts: 1405
- Joined: Thu Sep 27, 2007 10:29 am
- Location: South Wales
- Contact:
You won't be able t butt joint them accurately over 70 m2 as there will be some variation in size and a slight bevel edge means you can't correct the joint lenth ways on half bond with a saw I would go for 3-4 mm joint minimum and use an epoxy resin that will flow in to the joints and strike out the bevel edge with the top of a big round head nail before it sets .....add some flair with a boarder of your choice to set it off bit like this
-