anyone got one or know about them, we've got bad ground at this joba nd engineer recommending for a cost based approach to pile with 150mm piles,
can get a 130mm grundomat for £2k on ebay and then got a compressor, got mobile 12 kva welder so thinking of adding this to our tool shed although we might mass pour concrete instead, but be nice to offer this.
Grundomat driven piles
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
no? no one? erm.... further investigation required, seem to be cheap when you take into account muck away etc, then just a ground beam ontop of them
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
-
- Site Admin
- Posts: 1854
- Joined: Tue Aug 19, 2008 7:03 pm
- Location: kings lynn norfolk
- Contact:
To pile with a 130 you would probilly need 2 compressors,the tube has to be a couple or three mm bigger than the mole to allow sand to be put down tube so you can reverse it out,1 man wont lift a 130 mole, i own a 110 and that is a very heavy 6ft long,give TTUK a ring in bedford and as there advise on it they the uk mole center for grundomat,good bunch of guys
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk
http://mshpaving.co.uk
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
130mm mole goes in 150mm pointed pile, with dry mix etc then 1metre sections welded on as you go, looks like a good system we'll see what the grounds like today
Needs 3.2m3 of air/minute
Needs 3.2m3 of air/minute
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
-
- Posts: 348
- Joined: Sun Feb 24, 2008 8:34 pm
- Location: Widnes
- Contact:
-
- Posts: 1405
- Joined: Thu Sep 27, 2007 10:29 am
- Location: South Wales
- Contact:
-
- Posts: 2504
- Joined: Thu Jul 10, 2003 10:20 pm
- Location: hemel hempstead,herts. 01442 212315
I have seen this too, its used for post and rail fencing on the motorways
Dan the Crusher Man
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"