Other groundworks tasks, such as roads and footpaths, terracing, fencing, foundations, walls and brickwork, tools and plant.
-
London Stone Paving
- Posts: 2199
- Joined: Mon May 10, 2010 1:07 pm
- Location: Surrey
-
Contact:
Post: # 72330Post
London Stone Paving
lutonlagerlout wrote:btw getting set to have the elite gold tiles installed,which way up should they go?
riven or flat?
and what to seal with?
Elite gold tiles, riven face on the surface. you can seal with lithofin stain stop.
-
rab1
- Posts: 1869
- Joined: Sun Jun 07, 2009 10:19 pm
- Location: scotland
Post: # 72331Post
rab1
Could you not use steel purlings at 1500 cl as per 99% of industrial sheds. These can be upto 8m long.
God loves a tryer
-
lutonlagerlout
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
Post: # 72338Post
lutonlagerlout
London Stone Paving wrote:lutonlagerlout wrote:btw getting set to have the elite gold tiles installed,which way up should they go?
riven or flat?
and what to seal with?
Elite gold tiles, riven face on the surface. you can seal with lithofin stain stop.
cheers steve
going in the mother outlaws kitchen
any special does and donts?
LLL
-
London Stone Paving
- Posts: 2199
- Joined: Mon May 10, 2010 1:07 pm
- Location: Surrey
-
Contact:
Post: # 72340Post
London Stone Paving
rab1 wrote:Could you not use steel purlings at 1500 cl as per 99% of industrial sheds. These can be upto 8m long.
will have a look into that one Rab.
Tony, you cat really go wrong with that stuff. Doesn't mark easily but is still easy to cut