Hi ya all, My game is block paving and tarmac but build the odd wall and lay foundations. I built a concrete floor which he has built the block work on but he wants me to come back and do the floor screed for him. It is not a big area about 4mts x4mts, any advise would be really good. I am familiar with screed rails and know the mix has to be dryish, do I need to add any liquids to the mix?
Kind regards chaps
Kind regards chaps
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 214
- Joined: Wed Jan 02, 2008 12:59 pm
- Location: mells
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 1328
- Joined: Thu Mar 26, 2009 9:00 am
- Location: Warwickshire
- Contact:
-
- Posts: 27
- Joined: Tue Feb 15, 2011 11:13 am
- Location: coventry
Hello all,
I too am laying some screed. I have no experience of this but the area is quite small and will be under a bath. I took the old one out to find that the floor level is about 40mm lower than the rest of the bathroom floor.
Its is the contrete house base layer below it. The area is the size of a regular bath so not very big and won't be seen.
So basically do I mix 3:1 grit sand to cement with 100ml of pva to a dry mix that can be compressed in my hands. I shouldn't have a problem getting it level with rails etc.
Do I have to add fibres or doesn't it matter as it is under the bath and won't have any foot traffic on it?
I will need to seal the contrete floor with a pva / water mix - what ratios.
Thank you very much.
macgrl
I too am laying some screed. I have no experience of this but the area is quite small and will be under a bath. I took the old one out to find that the floor level is about 40mm lower than the rest of the bathroom floor.
Its is the contrete house base layer below it. The area is the size of a regular bath so not very big and won't be seen.
So basically do I mix 3:1 grit sand to cement with 100ml of pva to a dry mix that can be compressed in my hands. I shouldn't have a problem getting it level with rails etc.
Do I have to add fibres or doesn't it matter as it is under the bath and won't have any foot traffic on it?
I will need to seal the contrete floor with a pva / water mix - what ratios.
Thank you very much.
macgrl
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 27
- Joined: Tue Feb 15, 2011 11:13 am
- Location: coventry
Thank you very much lutonlager lout.
Two other quick questions -
do i really need fibres? - I can't seem to find them anywhere to buy. are they really that important considering the job I am doing.
Also I have had a look around and would a 3:1 mix be too strong? could i use 4/5:1
Thanks so much. Very much appreciated.
macgrl
Two other quick questions -
do i really need fibres? - I can't seem to find them anywhere to buy. are they really that important considering the job I am doing.
Also I have had a look around and would a 3:1 mix be too strong? could i use 4/5:1
Thanks so much. Very much appreciated.
macgrl
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 162
- Joined: Sun Jul 17, 2011 1:21 am
- Location: Essex
LLL, have to disagree. We supply 1000's of cubic metres of ready mixed floor screed every year, the vast majority of which is 4:1. Fibrescreed is increasing in popularity, mainly for use with underfloor heating systems. We are rarely asked for 3:1 - it's too rich!! All our screed is mixed in forced action mixers.
Macgrl - be careful to ensure the screed is fully dry before applying resilient floor coverings such as vinyl, particulary the very expensive stuff such as Amtico. The rule of thumb is 1 day per 1mm thickness but considerably longer if the screed is placed directly onto a concrete slab without a separating membrane between. Failure to do so could result in the vinyl bubbling and lifting due to vapour pressure. Other finishings such as carpet are not so critical.
Macgrl - be careful to ensure the screed is fully dry before applying resilient floor coverings such as vinyl, particulary the very expensive stuff such as Amtico. The rule of thumb is 1 day per 1mm thickness but considerably longer if the screed is placed directly onto a concrete slab without a separating membrane between. Failure to do so could result in the vinyl bubbling and lifting due to vapour pressure. Other finishings such as carpet are not so critical.
Retired DIY'er
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
have you got a link or reference for that brucie?
not doubting you ,but I have always been told to knock up floor screed at 3:1
the more cement the harder it is to screed but IME a far better job
the guys i use with the putzmeister use around 8 bags of cement to 1 tonne of grit sand,however this sand has an inherent moisture content,so maybe that is more like 4:1 too
LLL
not doubting you ,but I have always been told to knock up floor screed at 3:1
the more cement the harder it is to screed but IME a far better job
the guys i use with the putzmeister use around 8 bags of cement to 1 tonne of grit sand,however this sand has an inherent moisture content,so maybe that is more like 4:1 too