Do i need to put in a sub-base? - Do i need to put in a sub-base?
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 33
- Joined: Fri Aug 26, 2011 6:11 pm
- Location: St Albans
The slabs are all down, it took me three days to lay 24m2, it was a learning curve! The first mixes were a bit dry but once I got the hang of laying it on a wetter mix it went quicker and easier, and as you say LD&P it felt like they really bonded.
I messed up one gap, it was a bit wide, it was too late to adjust it, it was going off pretty quick in the full sun on Sunday! That threw a few others out, but its not too bad.
The gaps between the paving and sleepers will be filled with limestone chippings, the slabs at the edges are haunched to half their height.
LLL thanks for the tips on the SBR, at 100ml a mix i had a tiny bit left over and it felt like it helped keep it moving without it and the sun I would have struggled to get it out of the mixer!.
The wife is pretty pleased with it too, even took a photo to show the mother in law!
Just wanted to say thanks very much to all for all the help to get this far!
All that left now is the pointing, I have got two tubs Fastpoint form stone market, any tips on using it?
I messed up one gap, it was a bit wide, it was too late to adjust it, it was going off pretty quick in the full sun on Sunday! That threw a few others out, but its not too bad.
The gaps between the paving and sleepers will be filled with limestone chippings, the slabs at the edges are haunched to half their height.
LLL thanks for the tips on the SBR, at 100ml a mix i had a tiny bit left over and it felt like it helped keep it moving without it and the sun I would have struggled to get it out of the mixer!.
The wife is pretty pleased with it too, even took a photo to show the mother in law!
Just wanted to say thanks very much to all for all the help to get this far!
All that left now is the pointing, I have got two tubs Fastpoint form stone market, any tips on using it?
Trying to dig in the mud!
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 52
- Joined: Mon Sep 05, 2011 7:41 pm
- Location: London
- Contact:
Luton...Tanalised is pressure treated from the outside in, so the middle remains untreated. Any cross cuts need to have two coats on 'Ensele' to maintain the treatment If you rip along the grain then the timber has to be sent back for retreatment. Some treatment grades are better than others depending on the end use.
What's with the 'Sticking down' of the flags? I know we call them flags, but they don't blow away in the wind :-/ Each unto their own I suppose.
What's with the 'Sticking down' of the flags? I know we call them flags, but they don't blow away in the wind :-/ Each unto their own I suppose.
-
- Posts: 1568
- Joined: Mon May 10, 2010 9:58 pm
- Location: Gatwick
- Contact:
-
- Posts: 1951
- Joined: Sat Dec 06, 2008 10:28 pm
- Location: Preston, Lancashire
-
- Posts: 2199
- Joined: Mon May 10, 2010 1:07 pm
- Location: Surrey
- Contact:
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
well especially on steps and exposed edges injun stone has a tendency to moveThehandmadegarden wrote:Luton...Tanalised is pressure treated from the outside in, so the middle remains untreated. Any cross cuts need to have two coats on 'Ensele' to maintain the treatment If you rip along the grain then the timber has to be sent back for retreatment. Some treatment grades are better than others depending on the end use.
What's with the 'Sticking down' of the flags? I know we call them flags, but they don't blow away in the wind :-/ Each unto their own I suppose.
so you use a wetter mix and add SBR and they are stuck like peanut butter to a blanket :;):
i use the wet/sbr method and dont get rockers so it suits me
not saying other methods are wrong but i see a lot of rocking patio flags laid on drier mixes
LLL
-
- Posts: 52
- Joined: Mon Sep 05, 2011 7:41 pm
- Location: London
- Contact: