Scraping open ground - How long does it take to scrape an acre

Other groundworks tasks, such as roads and footpaths, terracing, fencing, foundations, walls and brickwork, tools and plant.
GB_Groundworks
Site Admin
Posts: 4420
Joined: Sat Aug 09, 2008 3:55 pm
Location: high peak
Contact:

Post: # 67263Post GB_Groundworks

yeah a d6 and a good driver will sort that, especially if youve not got to relay the soil.

depending on what the sub grade is like, but you are going to need an excavator of some sort unless you go for 45 degree batters as the dozer will struggle to cut steep batters.

can it not be cut and filled save some work?
Giles

Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.

http://www.gbgroundworks.com

Post Reply