High boarder to new patio project - Too low for walling, too high for timber
-
- Posts: 3
- Joined: Sat Jun 25, 2011 3:29 pm
- Location: United Kingdom
Hi all,
Fist time posting, and a novice DIYer so please be gentle!
I'm going to be laying new patio in july, I have dug down 8" below damp proof course ready to lay my materials down. Lots and lots of advice for that on this site so I'm feeling quite confident about it. The only issue is the edge to one side of my garden. Next door's garden is higher than mine, about 6" higher than my damp proof course, and their fencing isn't dug into the ground, it stops just shy of the the ground of their garden (so their is nothing to stop the soil from their garden crumbling into mine (other than the fact that it's mainly clay and sticks together well).
My question is, does anyone have any thoughts on what I should use to "wall" up to that level or up to the fence?
And what ever I do put it there, should I put it in before of after the patio?
We are most likely going for an indian limestone, so if it matches even better. Thanks for reading.
Simon
Picture is here:
Uploaded with ImageShack.us
All thoughts and recommendations appreciated!!
Fist time posting, and a novice DIYer so please be gentle!
I'm going to be laying new patio in july, I have dug down 8" below damp proof course ready to lay my materials down. Lots and lots of advice for that on this site so I'm feeling quite confident about it. The only issue is the edge to one side of my garden. Next door's garden is higher than mine, about 6" higher than my damp proof course, and their fencing isn't dug into the ground, it stops just shy of the the ground of their garden (so their is nothing to stop the soil from their garden crumbling into mine (other than the fact that it's mainly clay and sticks together well).
My question is, does anyone have any thoughts on what I should use to "wall" up to that level or up to the fence?
And what ever I do put it there, should I put it in before of after the patio?
We are most likely going for an indian limestone, so if it matches even better. Thanks for reading.
Simon
Picture is here:
Uploaded with ImageShack.us
All thoughts and recommendations appreciated!!
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Site Admin
- Posts: 4732
- Joined: Fri Jul 28, 2006 8:47 pm
- Location: Somerset
- Contact:
I'd just put a run of 250/300mm backedgers down through there. Simple and effective.
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset
See what we get up to Our Facebook page
See what we get up to Our Facebook page
-
- Posts: 1990
- Joined: Sun Mar 25, 2007 10:49 pm
- Location: N/Ireland
A backedger is the standard grey concrete retaining edgings that you see used on most new housing developments to a max height of about 400mm. I feel they're a bit utilitarian for gardens unless it's just a very basic one. Just to reiterate what LLL said you've not dug your base deep enough yet the finished height of the paving needs to be 150mm below your DPC so you need to dig down a min of 310mm ish from the dpc depending on your paving. Sleepers would need a retaining post to hold them in place beding and hauchinmg them with concrete won't work and they'll rot quickly to. What are you planning on layingand have you thought about steps and edgings etc.
Can't see it from my house
-
- Posts: 196
- Joined: Fri Jun 17, 2011 10:49 pm
- Location: Romford Essex
-
- Posts: 196
- Joined: Fri Jun 17, 2011 10:49 pm
- Location: Romford Essex