Hi

I am planning to build a 4x4m rear extension. Foul and water sewer pipes run parallel to the rear of the property (approx 1m away from rear wall). The sewers are approx 1.3m deep.

I was just seeking some advice on how best to approach the foundations for this build? I was initially looking at a trench fill foundation. Would it be fine to build a concrete footing either side of the sewer pipes, fill in the void with gravel and lintel over? How much of a gap should be left between the pipes and concrete footing?

Cheers

msh paving
Site Admin
Posts: 1854
Joined: Tue Aug 19, 2008 7:03 pm
Location: kings lynn norfolk
Contact:

Post: # 64065Post msh paving

bars03 wrote:Would it be fine to build a concrete footing either side of the sewer pipes, fill in the void with gravel and lintel over? How much of a gap should be left between the pipes and concrete footing?

Cheers
On no account do you stop/start footings,you will have to dig upto and under the pipe and a carry on along the footing,check with building control on how thick the concrete will need to be 225mm min.depending pipe dia. and at 1.3m deep you may be able to wrap with compressable fibre material and concrete over them, but this is for qualified people to decide,other wise it will be concrete under pipes and lintol over them MSH :)
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 64073Post lutonlagerlout

depending if it is a public sewer we have many times just dug 300MM past the invert level then shuttered eith side of the pipe approx 300mm back either way
but as mark says your BCO decided#s this
LLL
"what,you want paying today??"

YOUR TEXT GOES HERE

seanandruby
Site Admin
Posts: 4713
Joined: Mon Jun 26, 2006 11:01 am
Location: eastbourne

Post: # 64091Post seanandruby

The pipework should be about a metre away from any structure. We have before now had to cantiliver over the pipework, or, lay a raft slab over it, or divert the pipework. Depends who the bco is.
sean

Wideboy
Posts: 73
Joined: Sun Apr 03, 2011 7:52 am
Location: Melksham Wiltshire United Kingdom

Post: # 64096Post Wideboy

I know I'm not an expert but if I can add my two pence worth It would make sense to check the condition of any pipe work going under your extension to make sure it's all OK you don't want to be digging the floor up a later date to rectify a problem that was easy to do whilst it was all dug out! :)
"Live long and prosper"

A.V.A.G.O
Posts: 22
Joined: Tue Nov 30, 2010 9:53 pm
Location: East Mids

Post: # 64100Post A.V.A.G.O

Thans bars03 you saved me asking the same quetion, I too plan on putting a 4x3 extension on the back of my house, I believe I ave to go down 2m to get to my drain,

So it looks like I will need to go deeper 300mm below the pipe and run the concreate in, Do I then use trench blocks and span the pipe with a lintel and then finish the footings off to the correct height ?
thanks for looking :)