Hi,
I hope someone can help here. I had some ready-mix concrete delivered yesterday and it just doesn't seem right. It's very gravelly and as you can see from the pictures it looks aweful cosmetically, despite being compacted and rollered. Trowelling didn't make any difference either.
The slab is 10' x 10' for an 8' x 8' hot tub weighing around 2,500kg. This will have decking round it and a timber building over that, both of which will extend beyond the concrete slab. The slab is therefore taking the weight of the tub, plus some of the decking & building weight.
The ground was dug out to firm earth with a geotextile underneath 4" of MoT type 1 sub-base, then a 1000g damp-proof membrane and 4" of Drivecrate (supplied by Aggregates)
I ordered 1 cubic metre and they delivered around 1.5, which makes me think 50% too much gravel was added. It certainly looks that way. The remainder was dumped in a skip I have on my driveway.
My concern is the strength and integrity of the slab. For instance, the pile in the skip can be broken up by hand. It's also now been a day and I can break stones off the surface of the slab with my fingers. Will it eventually crack & crumble with the hot tub, decking & building on top?
The company are investigating the mix for me, but I'd like an independant opinion. Will this slab be strong enough for its intended purpose, or do need to pull up this concrete and get a new lot delivered?
Would appreciate any advice, pictures are below...
Many thanks,
Avann.
I hope someone can help here. I had some ready-mix concrete delivered yesterday and it just doesn't seem right. It's very gravelly and as you can see from the pictures it looks aweful cosmetically, despite being compacted and rollered. Trowelling didn't make any difference either.
The slab is 10' x 10' for an 8' x 8' hot tub weighing around 2,500kg. This will have decking round it and a timber building over that, both of which will extend beyond the concrete slab. The slab is therefore taking the weight of the tub, plus some of the decking & building weight.
The ground was dug out to firm earth with a geotextile underneath 4" of MoT type 1 sub-base, then a 1000g damp-proof membrane and 4" of Drivecrate (supplied by Aggregates)
I ordered 1 cubic metre and they delivered around 1.5, which makes me think 50% too much gravel was added. It certainly looks that way. The remainder was dumped in a skip I have on my driveway.
My concern is the strength and integrity of the slab. For instance, the pile in the skip can be broken up by hand. It's also now been a day and I can break stones off the surface of the slab with my fingers. Will it eventually crack & crumble with the hot tub, decking & building on top?
The company are investigating the mix for me, but I'd like an independant opinion. Will this slab be strong enough for its intended purpose, or do need to pull up this concrete and get a new lot delivered?
Would appreciate any advice, pictures are below...
Many thanks,
Avann.
-
- Posts: 1328
- Joined: Thu Mar 26, 2009 9:00 am
- Location: Warwickshire
- Contact:
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 2
- Joined: Wed May 18, 2011 11:59 am
- Location: Cheshire
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
Make sure you specify when you order like gen 1-3 or c20-40 etc
The higher the number the more cement content and ergo more strength and expense I'd have said a gen 1 or c20 would be fine and trowel up nice.
See the first barrow full then get the driver to add more water and wet it up, seanandruby will say that wetting it up affects it's structural strength but he works on terminal 5 etc for your hottub it will be fine. Wants to be creamy.
The higher the number the more cement content and ergo more strength and expense I'd have said a gen 1 or c20 would be fine and trowel up nice.
See the first barrow full then get the driver to add more water and wet it up, seanandruby will say that wetting it up affects it's structural strength but he works on terminal 5 etc for your hottub it will be fine. Wants to be creamy.
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
-
- Posts: 1951
- Joined: Sat Dec 06, 2008 10:28 pm
- Location: Preston, Lancashire
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 952
- Joined: Mon Oct 30, 2006 8:24 pm
- Location: Bournemouth, Dorset
-
- Posts: 193
- Joined: Mon Feb 16, 2009 10:25 pm
- Location: UK
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
I'm the same as the next man when it comes to holding your dick and making a drink sign with the hands m8, on a big pour when concrete isn't spreading as easy as you would like. On these 2.5billion pound jobs the concrete is ordered to a set slump and neither i, nor God can change it. There is an engineer permanently stood by the pump etc: only he has the discretion to add a set amount of water, which will be in the lower litres. On a slab you can just about get away with it but on a wall where there is a chance of separation of the agg etc it needs to be up to spec. On a wall too much water becomes apparent with the drag lines and larger blow holes, making for a boney finish. Even secondary pokering doesn't help much. Apologies for doing my job right G B and D N ??? Back to main topic. I would expect the spec i ordered to be delivered, if the company has f***** up, then i'd expect them to put it right with no expense to me.