Recent work

Other groundworks tasks, such as roads and footpaths, terracing, fencing, foundations, walls and brickwork, tools and plant.
Post Reply
rimexboy
Posts: 916
Joined: Thu Aug 07, 2008 8:31 pm

Post: # 61015Post rimexboy

LLL while your there change the corner braket on the guttering....

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 61706Post lutonlagerlout

corner bracket changed rimex :;):
(and i did actually change it)
onwards and upwards
new job started monday
bit of demo to kick things off
Image

Image

Image

Image

Image

Image

Image

Image

so 5 skips of hardcore taken away,roof timbers recycled to the allotment association
messr Digdugdan kindly hired us a crusher and a further skip ful of hardcore becomes 10 tonnes of type 1 :)
save the planet
tomorrows job stripping this roof

Image

anyone need 1400 plain clay tiles ???
going cheep cheep
footings monday at the other job
cheers LLL
"what,you want paying today??"

YOUR TEXT GOES HERE

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 61714Post lutonlagerlout

roof all gone ,timber gone to allotment and tiles going on ebay
beautiful day down here in sunny luton!
anyone fancy a virtual peesh up?
LLL :)
"what,you want paying today??"

YOUR TEXT GOES HERE

dig dug dan
Posts: 2504
Joined: Thu Jul 10, 2003 10:20 pm
Location: hemel hempstead,herts. 01442 212315

Post: # 61716Post dig dug dan

looks good tony (although i did see it first hand). What are you doing up at 4 in the morning?
Dan the Crusher Man
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 61717Post lutonlagerlout

the early bird catches the worm :;):
LLL
"what,you want paying today??"

YOUR TEXT GOES HERE

digerjones
Posts: 889
Joined: Fri Jan 18, 2008 9:32 pm
Location: cheshire

Post: # 61723Post digerjones

tony, could'nt you have crushed all the hardcore and got rid of it somewhere else. even crushed it into the skip and done a deal with skip firm. only my thoughts. i live in the countryside with plenty of room.
dylan

haggistini
Posts: 1405
Joined: Thu Sep 27, 2007 10:29 am
Location: South Wales
Contact:

Post: # 61727Post haggistini

How long would it take to crush 10T with that size crusher tony?

A couple of snaps

Image

Image

Image

Let's hope the weather stays like this... :cool:
http://www.G-Tech.co
Bespoke Paving Contractor
M:07944036174

Less yap yap more tap tap!

ilovesettsonmondays
Posts: 1071
Joined: Sat Aug 22, 2009 8:57 pm
Location: essex

Post: # 61729Post ilovesettsonmondays

nice work hag, how much do the little setts cost a metre and how many in a crate or will they split a crate .

Mikey_C
Posts: 952
Joined: Mon Oct 30, 2006 8:24 pm
Location: Bournemouth, Dorset

Post: # 61734Post Mikey_C

me and the old man (aka not so quick on his feet now days) did 14 overflowing ton bags in about 7 hours, loading by hand.

GB_Groundworks
Site Admin
Posts: 4420
Joined: Sat Aug 09, 2008 3:55 pm
Location: high peak
Contact:

Post: # 61735Post GB_Groundworks

Nice work tony, make sure they get you to sort the paving out hehe

did you get rid of the tiles? Our local roofing supply/contractor will buy most roofs and come strip them for you etc

Most skips places either deliver the hardcore direct for sub base etc fill in bad ground or have the big crushers and crush it themselves. What's it work out at?I Can buy 20 tons of virgin limestone mot for £220 Inc vat at mo, so you've got say £70-90 labour, then the cost of the hire? Does the math work out for a lesser product?

Is it per dtp type 1 803 sieve sizing? Seems some large stuff at bottom of piles Inc half bricks, is it more "hard core" as opposed to type 1 in a true technical sense?
Giles

Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.

http://www.gbgroundworks.com

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 61737Post lutonlagerlout

it took the labourer 6 hours to crush the pile,its only guestimate on the amounts as its hard to tell
about 1.5 skips clean hardcore = £225 to remove
plus would need to import 10-12 tonnes of type 1 = £250
so roughly £475

crusher hire £150
labourer say 2 days to include moving the stuff £160
diesel £7.10
=£317.10
so there is a saving,the thing to remember is that the crusher has 1 speed,in the past we have had 2 men loading and its too much and just slows it down,1 man loading and moving the crusher works well
also we had to use water as the dust was quite bad

i asked the BCO and she said as long as it goes through a 35mm gap its fine to use,the 2 half batts were a brick that paul noticed after we had finished and washed the crusher. i said throw it on the pile

the crusher works well but you need the room
most of our jobs we dont have the room so the stuff gets binned
the 1 thing it does do is it helps people with their eco aspirations,that job is having 30k of solar panels fitted so re suing the aggregate helps their green credentials

i wouldnt say its an inferior product,as we did it our selves we know there is no mud,cement bags or timber in it

:)
BTW very nice work haggi ,a man after my own heart with all those lines :)
cheers LLL
"what,you want paying today??"

YOUR TEXT GOES HERE

msh paving
Site Admin
Posts: 1854
Joined: Tue Aug 19, 2008 7:03 pm
Location: kings lynn norfolk
Contact:

Post: # 61738Post msh paving

GB_Groundworks wrote:Nice work tony, make sure they get you to sort the paving out hehe

did you get rid of the tiles? Our local roofing supply/contractor will buy most roofs and come strip them for you etc

Most skips places either deliver the hardcore direct for sub base etc fill in bad ground or have the big crushers and crush it themselves. What's it work out at?I Can buy 20 tons of virgin limestone mot for £220 Inc vat at mo, so you've got say £70-90 labour, then the cost of the hire? Does the math work out for a lesser product?

Is it per dtp type 1 803 sieve sizing? Seems some large stuff at bottom of piles Inc half bricks, is it more "hard core" as opposed to type 1 in a true technical sense?

with our micro crushers the finished product size can be adjusted from 70mm to 15\20mm type 1 sizing is no problem,the larger crush size quicker it is,i usually do the last 3-4t to 30mm for final grading,your lucky you can buy limestone at that price last week in bedford i was paying £15t for granet fill from croft quarry near MT sorrel,.type 1 with ticket £16t, east anglia price for type one ranges £15-22 ton crushed concrete or crushed rail ballast to type 1 is £16t MSH :)




Edited By msh paving on 1302437362
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk

GB_Groundworks
Site Admin
Posts: 4420
Joined: Sat Aug 09, 2008 3:55 pm
Location: high peak
Contact:

Post: # 61740Post GB_Groundworks

lll only say inferrior due to that study i found where it showed the los angeles wearing test result from crushed brick was like 500 compared to limestone which was 5000 or something i posted it on that thread, but most bought in crusher run has everyting inc the kitchen sink in it

mark we are in the heart of the penines lots of mountains to dig out and crush hehe hence cheap stone etc
Giles

Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.

http://www.gbgroundworks.com

dig dug dan
Posts: 2504
Joined: Thu Jul 10, 2003 10:20 pm
Location: hemel hempstead,herts. 01442 212315

Post: # 61741Post dig dug dan

there is rumour of an aggregate tax coming in on quarried stone, in order to try and make us all recycle, yet on the other hand, the crusher operators licences make it costly to own anything bigger than 15hp :( you can't win with the government!
Dan the Crusher Man
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 61742Post lutonlagerlout

the bricks we crushed were all semi engineering types so i guess they will hold up
its the transport costs that add up down south
mind you we get sand a lot cheaper as we have multiple sand pits in a 10 miles radius
just no stone
LLL
"what,you want paying today??"

YOUR TEXT GOES HERE

Post Reply