Raft foundation
-
- Posts: 1405
- Joined: Thu Sep 27, 2007 10:29 am
- Location: South Wales
- Contact:
-
- Site Admin
- Posts: 1854
- Joined: Tue Aug 19, 2008 7:03 pm
- Location: kings lynn norfolk
- Contact:
almost impossible to answer, steel,mesh, depth of concrete,
A393 or A252 mesh £12 a sheet difference in price,depth of dig,
muck away etc etc MSH
A393 or A252 mesh £12 a sheet difference in price,depth of dig,
muck away etc etc MSH
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk
http://mshpaving.co.uk
-
- Posts: 1405
- Joined: Thu Sep 27, 2007 10:29 am
- Location: South Wales
- Contact:
-
- Posts: 1405
- Joined: Thu Sep 27, 2007 10:29 am
- Location: South Wales
- Contact:
-
- Posts: 1405
- Joined: Thu Sep 27, 2007 10:29 am
- Location: South Wales
- Contact:
-
- Posts: 1405
- Joined: Thu Sep 27, 2007 10:29 am
- Location: South Wales
- Contact:
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
10 by 6 = 9 M3 at 150mm thick of crete = £720 +vat
3 tonne digger plus driver for 1 + banksman = £400+ vat
1 muck away load =£250 +vat
mesh (approx) = £100 +vat
supply and fix shutter and joints = £200 +vat
lay concrete and clear site = £250 +vat
profit times 2? +25% your choice =???????????
£1930 +vat before profit
cheers LLL
3 tonne digger plus driver for 1 + banksman = £400+ vat
1 muck away load =£250 +vat
mesh (approx) = £100 +vat
supply and fix shutter and joints = £200 +vat
lay concrete and clear site = £250 +vat
profit times 2? +25% your choice =???????????
£1930 +vat before profit
cheers LLL
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
starting a 6x7 raft tomorrow with a 13m x2m x 250mm thick concrete wall tomorrow best part of £5500 provisional before breaking ground then £8 a ton muck away
steel alone 5xa193 5 x 1393 70 x code 11 shapes 200 concrete 40mm spacers, 20m tomberone mesh spacers = £766 alone
if the engineer has spec it its easy to price, as its a raft then it must have been speced but just saying 10x6 is vague
steel alone 5xa193 5 x 1393 70 x code 11 shapes 200 concrete 40mm spacers, 20m tomberone mesh spacers = £766 alone
if the engineer has spec it its easy to price, as its a raft then it must have been speced but just saying 10x6 is vague
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
-
- Site Admin
- Posts: 1854
- Joined: Tue Aug 19, 2008 7:03 pm
- Location: kings lynn norfolk
- Contact:
a sheet off A252 is around £35-40 for 2.4x4.8m sheet 2 layers 12 sheets allowing for lap £480 for mesh, most rafts in this area are 200mm thick and 450mm x300mm edge beam +middle beams,
thats with out cut and bent steel for beams, in this area due to peat at 2m you could double that price Tony MSH
thats with out cut and bent steel for beams, in this area due to peat at 2m you could double that price Tony MSH
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk
http://mshpaving.co.uk
-
- Posts: 1405
- Joined: Thu Sep 27, 2007 10:29 am
- Location: South Wales
- Contact:
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
lads haggi asked for a ball park so thats what i gave him
last constructional raft we did was 2 layers and a cage around the toe, 300mm thick on the flat and 600 deep on the toe by 450 wide
building over an old rubbish dump 10M of bad ground
I only allowed 5 sheets and i did say approx,I know steel is racking up price wise all the time
need a drawing for stuff like that
cheers LLL
last constructional raft we did was 2 layers and a cage around the toe, 300mm thick on the flat and 600 deep on the toe by 450 wide
building over an old rubbish dump 10M of bad ground
I only allowed 5 sheets and i did say approx,I know steel is racking up price wise all the time
need a drawing for stuff like that
cheers LLL
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
as a follow on to this thread, we have a school job coming up at easter
approx 1 weeks work for 7 blokes
anyway we have submitted our risk assessment and HS plan
but have now been told we must have an office,drying room ,and toilet on site,along with 100M of arris fencing
this little shebang adds £500 to 1 weeks work straight off
you have to bear these incidentals in mind when pricing
LLL
approx 1 weeks work for 7 blokes
anyway we have submitted our risk assessment and HS plan
but have now been told we must have an office,drying room ,and toilet on site,along with 100M of arris fencing
this little shebang adds £500 to 1 weeks work straight off
you have to bear these incidentals in mind when pricing
LLL
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
yeah welfare unit for the lads, hot water etc coat drying etc, we bought our own porta loo for ease and get it on a weekly clean and suck out from a company, we've got enough herras fencing to do twice rd a rugby pitch, had to do it when we built a stand make a 2 metre walkway all the way rd so got about 300 herras panels stacked behind the barn, shame your down sarth tony. theres £400 in ply to shutter that wall in my job, renting shutters was not much cheaper than making them
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
why do i call it arris fencing? LOL
new one today,as well as the 1.8M haerras fence we need another 1 metre fence 900 away to stop the little horrors getting close to the herras!!!!!
also any gap under the heras has to be boarded and secured to stop them inscaping to our work area
and its blooming half term!!!
LLL :laugh:
new one today,as well as the 1.8M haerras fence we need another 1 metre fence 900 away to stop the little horrors getting close to the herras!!!!!
also any gap under the heras has to be boarded and secured to stop them inscaping to our work area
and its blooming half term!!!
LLL :laugh: