Hi All,

After months of lurking and learning I've finally got to the point of needing to pose a question. (which in itself is a measure of how much excellent material there is on this site and forum!!)

I've taken on a monster DIY project to:
- level the top quarter of my garden (have spent odd evenings over the last few months removing 10 tonnes of earth by hand and barrowing it round to the front of the house for disposal (limited access and too tight to hire machinery/pay somebody :). Now facing the task of breaking and removing 10m2 of cement sub-base from the old paving. Keeps me busy...

- pour a 5m square concrete base to plonk an above ground wooden swimming pool on

- put a 3x2m summer house in

- pave the 20+ m2 between the summer house and the pool

An unplanned aspect of this has been the realisation that one of the gardens that ajoins ours to the rear is actually 50cm higher and that the rather poorly looking fence there has been retaining some of the earth. I'm therefore planning on removing the fence and building a retaining wall - roughly 1.2m x 11m. There is actually a poured concrete earth retainer 20cm into the neighbours garden at the highest point which is holding back most of the earth so the new wall won't be holding a lot weight but I was planning on playing safe and build it from 7n 440x215x215 dense, hollow blocks tied in with vertical rebar on a 600mm(w)x275mm(d) footing.

My question is - given the length of the wall (and the fact that only half of it will be retaining earth) I'm assuming I should build in one or two movement joints? If so, what do I put into the gap? I've found the Brickfill product which is only 100mm wide - is there something similar for blockwork or would I just use two pieces of this with a gap in between?

Many thanks,

John

dig dug dan
Posts: 2504
Joined: Thu Jul 10, 2003 10:20 pm
Location: hemel hempstead,herts. 01442 212315

Post: # 57804Post dig dug dan

presumably you are going to face the wall with some sort of brickwork?
The last time i put an an expansion joint in, i used fibre board, then used a silicone sealant on that to mask it.
its been there for 6 years now, no problems at all.
Dan the Crusher Man
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"

cszjrh
Posts: 20
Joined: Thu Jan 06, 2011 11:45 am
Location: Purley, Surrey.

Post: # 57805Post cszjrh

Hi Dan,

No - I was going to render it. With 13m2 to cover I might even get pretty handy at it by the end ;)

Fibreboard as in Flexcell or something like that? Fair enough - I found a booklet on the web warning against using that as it doesn't compress easily and might cause problems. Good to hear that you've seen it work.

Thanks,

John

cszjrh
Posts: 20
Joined: Thu Jan 06, 2011 11:45 am
Location: Purley, Surrey.

Post: # 57806Post cszjrh

BTW - I've got a pile of bricks and stones piled up about 1m3 so will definitely be getting in touch in a couple of months to discuss hiring a crusher. Really don't want to have to move all of that round the front and several tonnes of hardcore back again...

John

dig dug dan
Posts: 2504
Joined: Thu Jul 10, 2003 10:20 pm
Location: hemel hempstead,herts. 01442 212315

Post: # 57807Post dig dug dan

Great.! :D
Dan the Crusher Man
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"

rab1
Posts: 1869
Joined: Sun Jun 07, 2009 10:19 pm
Location: scotland

Post: # 57830Post rab1

MSH does Crusher hire as well, sorry Dan but 2no quotes depending on area are better than 1no. :)
God loves a tryer

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 57833Post lutonlagerlout

its a long way from kings lynn to purley rab ???
LLL
"what,you want paying today??"

YOUR TEXT GOES HERE

rab1
Posts: 1869
Joined: Sun Jun 07, 2009 10:19 pm
Location: scotland

Post: # 57835Post rab1

I`ve no idea where Kings Lynn is and Purly ?. Only wanted to be fair and give all the lads a shot but Dan is the crusher man
God loves a tryer

cszjrh
Posts: 20
Joined: Thu Jan 06, 2011 11:45 am
Location: Purley, Surrey.

Post: # 57837Post cszjrh

Thanks guys.

My fun and games continue. Removed another tonne last night and took a closer look at the other garden. What I thought was a prepoured retaining wall is actually a breached block retaining wall with soil spewing through it and blocks pointing in all directions :(

Will definitely need to take a closer look to see why it failed and probably remove most of it for fear it will come down into my new wall. Joy.

dig dug dan
Posts: 2504
Joined: Thu Jul 10, 2003 10:20 pm
Location: hemel hempstead,herts. 01442 212315

Post: # 57848Post dig dug dan

Only wanted to be fair and give all the lads a shot but Dan is the crusher man


no problem. In fact, had it been norfolk way, i would have passed it on anyway!
Thats what this forum is all about. Sharing!
Dan the Crusher Man
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"

rab1
Posts: 1869
Joined: Sun Jun 07, 2009 10:19 pm
Location: scotland

Post: # 57851Post rab1

once said R&A was the cleaning man and Amogen had responded to the post, felt like a complete tit that night lol. :D
God loves a tryer

msh paving
Site Admin
Posts: 1854
Joined: Tue Aug 19, 2008 7:03 pm
Location: kings lynn norfolk
Contact:

Post: # 57852Post msh paving

dig dug dan wrote:no problem. In fact, had it been norfolk way, i would have passed it on anyway!
Thats what this forum is all about. Sharing!

Nice one Dan.... thx :D




Edited By msh paving on 1294425753
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk

cszjrh
Posts: 20
Joined: Thu Jan 06, 2011 11:45 am
Location: Purley, Surrey.

Post: # 59946Post cszjrh

Another question on movement joints - what the heck do I do with the coping stones? If I leave a 10mm gap betwen them its going to look awful...

Cheers, John

Pablo
Posts: 1990
Joined: Sun Mar 25, 2007 10:49 pm
Location: N/Ireland

Post: # 59947Post Pablo

I think you're going way overboard on the spec if the wall is only retaining max 50 cm of soil then a standard block on flat wall with 4 or 5 hidden pillars Will be more than up to the job. Also for that length it's debatable whether an expansion joint is needed. If it's tied to another wall or the house use one there and if you want to put another in then 1 in the middle Will do. If the neighbour has piled the soil against the fence without a retainer then you should ask him to sort it because Thats bad form or at the least he should contribute some cash towards it.



Edited By Pablo on 1298649825
Can't see it from my house

cszjrh
Posts: 20
Joined: Thu Jan 06, 2011 11:45 am
Location: Purley, Surrey.

Post: # 59948Post cszjrh

Hi Pablo - thanks for the feedback.

As I refined my plans I found that it will be actually be retaining 1m of earth for about 4m of the length. (the rest won't retain anything). The total length will 11m->a corner->6m and the wall will be 1.7m high so my plan was to put the joint 4m away from the corner on the long leg.

Does it sound like I'll get away without a joint given that length?