Update on drainage
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
-
- Site Admin
- Posts: 4732
- Joined: Fri Jul 28, 2006 8:47 pm
- Location: Somerset
- Contact:
Sean! Stunning photos of some very intricate work there that will be buried, no-one will ever be able to appreciate it or the work that has gone into it.
That pipework - does each run/joint have to be air tested prior to moving on?
Great pics, you've doen yourself proud to get them all uploaded and working, very slick indeed. Thanks for doing so, appreciated.
That pipework - does each run/joint have to be air tested prior to moving on?
Great pics, you've doen yourself proud to get them all uploaded and working, very slick indeed. Thanks for doing so, appreciated.
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset
See what we get up to Our Facebook page
See what we get up to Our Facebook page
-
- Posts: 1136
- Joined: Sun May 08, 2005 9:25 am
- Location: North West
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
There is so many spurs, pop ups etc:it is nigh' on impossible to test as you go. I tend to do a mass test once the chambers and end caps in place. The denso is to protect collar and form a barrier for any movement. It is quite intricate and very difficult at times crawling on your belly most of the time to get in cages. We are on pour 40 out of 72. Each pour has an average of 70 metres of pipework.so we are always being chased by the concrete, no room for error. Average a thousand metres of concrete per slab pour.
sean
-
- Posts: 1405
- Joined: Thu Sep 27, 2007 10:29 am
- Location: South Wales
- Contact:
-
- Posts: 1951
- Joined: Sat Dec 06, 2008 10:28 pm
- Location: Preston, Lancashire
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
nice work sean, few questions
what tolerance to you work to so when you bring a pipe up through the top of the slab whats the +/- on its position and do you engineers check falls etc or you use an automatic or lazer level or total station. or just string and little level
and are you basically allowed to use as mush pipe/joints/denso tape as you want?
not a job for me crawling around in all that rebar haha, to many mince pies lol
what tolerance to you work to so when you bring a pipe up through the top of the slab whats the +/- on its position and do you engineers check falls etc or you use an automatic or lazer level or total station. or just string and little level
and are you basically allowed to use as mush pipe/joints/denso tape as you want?
not a job for me crawling around in all that rebar haha, to many mince pies lol
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
-
- Posts: 585
- Joined: Tue Aug 29, 2006 9:02 pm
- Location: Luanda, Angola
I thought I bent a lot of rebar till I saw that... looks good.
I like those little yellow plastic things you sometimes place on top of the bars to stop people sckewering themselves or catching clothes on the bars. What are they called, where do you buy them? I have mildly injured/caught myself enough times on sticking up bars!
How do you bend your bars? Onsite, offsite or are some ready bent? Do you use a bar bender, if so what type?
I like those little yellow plastic things you sometimes place on top of the bars to stop people sckewering themselves or catching clothes on the bars. What are they called, where do you buy them? I have mildly injured/caught myself enough times on sticking up bars!
How do you bend your bars? Onsite, offsite or are some ready bent? Do you use a bar bender, if so what type?
-
- Posts: 420
- Joined: Mon Jun 29, 2009 11:14 pm
- Location: uk
-
- Posts: 585
- Joined: Tue Aug 29, 2006 9:02 pm
- Location: Luanda, Angola
So the guys who sell the rebar bend it for you?irishpaving wrote:If on a big site then a bar schedule is normally in use which the order is placed off.
I normally produce a bar schedule but I have to buy the bar in 12m lengths and have my guys in the yard cut and bend it - but I often find I need to set up a little bar bending facility on most sites too, particularly in renovation work.
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
i may be wrong but think there will be a steal fixing crew on this job, sean has his hands full getting all the pipe in let alone all the rebar, we buy ours pre bent to standard shapes or to scedules,
see BS shape codes http://www.rom.co.uk/products/shape-codes.aspx
see BS shape codes http://www.rom.co.uk/products/shape-codes.aspx
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
it's +/- 10ml. Most of it is set on the blinding, so i use a plumb bob and plumb up. If set out on the top mat plumb down. To many laterals rod eyes gullies for lazer, i use a/string line to bottom of pipe. 2 wraps with denso. Bars ready bent , some bars weigh over 3 1/2 hundred weight. Some bars bent on site with electric roller bender. End caps ( mushrooms) buildbase or similar. Plenty raring but soon forgot. Busy, hard, tight programme :laugh:
sean
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
-
- Posts: 1328
- Joined: Thu Mar 26, 2009 9:00 am
- Location: Warwickshire
- Contact: