To edge first or not to edge first?

All forms of block paving, brick paving, flexible or rigid, concrete or clays, new construction or renovation
Post Reply
Blocker
Posts: 67
Joined: Sun Sep 05, 2010 4:17 pm
Location: Kent. UK

Post: # 53642Post Blocker

Hello All.

Well I wish I'd found this forum before, I start my project in the morning!
I'm block paving our drive 15m x 4m with a single block edging with the blocks laid
long edges together.

Anyway, first question of probably loads...............

After I've dug out, do I spread the type1 in the fresh dug hole first before I lay the edgings
or do I lay edging course first and then have the type1 tipped in between the edgings, as
I intended having the entrance only 2.4m wide for the first 4m then tipper truck wouldn't
be able to fit in if the edger's were in first.

Regards.

seanandruby
Site Admin
Posts: 4713
Joined: Mon Jun 26, 2006 11:01 am
Location: eastbourne

Post: # 53643Post seanandruby

You should have the whole drive dug out and DTP1 spread, wackered etc: Once you have that done you have a clean sub-base work area to lay your edgings to.
sean

Blocker
Posts: 67
Joined: Sun Sep 05, 2010 4:17 pm
Location: Kent. UK

Post: # 53647Post Blocker

Would you then have to dig channels in the type1 to take the mix that the edging blocks are set in, or they will be to high.

200mm dig out
100mm type1
35mm sand
65mm block

100mm mix under edgers, so a 35mm channel?

Regards.

seanandruby
Site Admin
Posts: 4713
Joined: Mon Jun 26, 2006 11:01 am
Location: eastbourne

Post: # 53663Post seanandruby

yes, make sure you have a good bed of concrete and haunching. No need for sand under concrete edgings.
sean

Blocker
Posts: 67
Joined: Sun Sep 05, 2010 4:17 pm
Location: Kent. UK

Post: # 53670Post Blocker

All dug out! Rain stopped play, I'll start another post soon with pic's as I go, please feel free to criticise, laugh or praise. ???

Blocker
Posts: 67
Joined: Sun Sep 05, 2010 4:17 pm
Location: Kent. UK

Post: # 53692Post Blocker

Just one other thing.

How deep do I spread the MOT type 1, to BEFORE I compact it with the vib/roller? I'm aiming to get a compacted finish of 100mm. I don't want to put to much in that it won't compact down enough.

Regards.

pickwell paving
Posts: 190
Joined: Wed Jul 14, 2010 8:27 pm
Location: lincs

Post: # 53704Post pickwell paving

depends how big a wacker or roller your using but i would try about 75mm down from finish level good compaction and then top up or reduce to suit, it shouldn't be too far out though.
Paving and Groundworks in Lincolnshire

01526 342202 07774 424275

Blocker
Posts: 67
Joined: Sun Sep 05, 2010 4:17 pm
Location: Kent. UK

Post: # 53715Post Blocker

I think of it the other way round from base up, so you recon on a 125mm spread, that's only 25mm over the 100mm for compaction, is that enough? (walk behind vibrating roller)

pickwell paving
Posts: 190
Joined: Wed Jul 14, 2010 8:27 pm
Location: lincs

Post: # 53716Post pickwell paving

I don't think it will go down much more than 25mm but you can always top it up, easier than having to dig any out.