Pipe laying - 450mm concrete

Foul and surface water, private drains and public sewers, land drains and soakaways, filter drains and any other ways of getting rid of water.
Post Reply
junior02
Posts: 3
Joined: Tue Aug 17, 2010 8:28 pm
Location: england

Post: # 52860Post junior02

hi to the forum. can any members help me with problem. i will be laying 450mm concrete pipes, want to know what goes in manhole is it butt end or spigot end and what do i come out of manhole with spigot or butt end, and i have pipes with 6in holes in to pick up gullies do these pipes have to be laid so hole is at top or on side to pick up gullies, and when setting laser how do i set it for the direction to the next manhole pin set buy the engineer. thanks in advance for any help..
construction

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 52869Post lutonlagerlout

are you sure you should be doing this?
all drainage goes male into female in the direction of flow
but laying 450 drains will need a machine driver ,banksman and an experienced pipe layer
no room for error
are you working with someone else?
LLL
"what,you want paying today??"

YOUR TEXT GOES HERE

junior02
Posts: 3
Joined: Tue Aug 17, 2010 8:28 pm
Location: england

Post: # 52873Post junior02

yes working with 1 person and excavater driver, so its male to female in direction of flow,cheers for that, what about the pipes to pickup the gullies are they laid so that the 6in inlet hole is on the side then pick up on 45degree bend or on the top?
construction

flowjoe
Posts: 1136
Joined: Sun May 08, 2005 9:25 am
Location: North West

Post: # 52875Post flowjoe

Sean, where are you ! !
http://draindomain.com

Many paths can lead to riches, few in sunlight, some in ditches

seanandruby
Site Admin
Posts: 4713
Joined: Mon Jun 26, 2006 11:01 am
Location: eastbourne

Post: # 52889Post seanandruby

laying pipes that needs a machine to lift them in place is a risky job in the wrong hands, ie unskilled labour. You need a square end going into the manhole with coller out to take the rocker pipe. That's ok if your going up the trench but sometimes there is a need to lay down flow, which makes it that much harder to push them home. The holes need to be top and use a slight radius for direction.
sean

seanandruby
Site Admin
Posts: 4713
Joined: Mon Jun 26, 2006 11:01 am
Location: eastbourne

Post: # 52890Post seanandruby

......sorry doing on phone, so limited to amount of text. Push them in square with machine using 6x4 to stop damage to pipe. You can tweak them over once their in but only a few degrees on each pipe. Use plenty of greece if already got rubber in, no greece if it's a seperate rubber. Hope this helps.
sean

seanandruby
Site Admin
Posts: 4713
Joined: Mon Jun 26, 2006 11:01 am
Location: eastbourne

Post: # 52892Post seanandruby

You can set laser to the gradient, has been known to backfall :;):
sean

rab1
Posts: 1869
Joined: Sun Jun 07, 2009 10:19 pm
Location: scotland

Post: # 52913Post rab1

dont take this the wrong way mate, but think you should pm sean and ask for all the help he can give you. :p
God loves a tryer

junior02
Posts: 3
Joined: Tue Aug 17, 2010 8:28 pm
Location: england

Post: # 52916Post junior02

thanks for the advice sean,, cheers mate, and hi rab, not taken it wrong way and i will pm sean if get any probs. cheers again lads..
construction

msh paving
Site Admin
Posts: 1854
Joined: Tue Aug 19, 2008 7:03 pm
Location: kings lynn norfolk
Contact:

Post: # 52918Post msh paving

seanandruby wrote:. Use plenty of greece if already got rubber in, no greece if it's a seperate rubber. Hope this helps.
So where in Greece are you laying the pipe the sean :D or are we using pipe lube grease..... :D :D MSH
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk

GB_Groundworks
Site Admin
Posts: 4420
Joined: Sat Aug 09, 2008 3:55 pm
Location: high peak
Contact:

Post: # 52929Post GB_Groundworks

are you using trench shoring? how deep are the pipes, trench boxes or sheet pilling or battering the trench back to 45 degree sides? what you bedding them on and back filling with?
Giles

Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.

http://www.gbgroundworks.com

seanandruby
Site Admin
Posts: 4713
Joined: Mon Jun 26, 2006 11:01 am
Location: eastbourne

Post: # 52979Post seanandruby

msh paving wrote:
seanandruby wrote:. Use plenty of greece if already got rubber in, no greece if it's a seperate rubber. Hope this helps.

So where in Greece are you laying the pipe the sean :D or are we using pipe lube grease..... :D :D MSH
well done you found the deliberate mistake. I can see i will have to make it trickier for you next time. Just came back from 2 weeks in crete, so grease is on my mind at the moment :;):
sean

flowjoe
Posts: 1136
Joined: Sun May 08, 2005 9:25 am
Location: North West

Post: # 52984Post flowjoe

According to Frankie Valli, Greece is the word :)
http://draindomain.com

Many paths can lead to riches, few in sunlight, some in ditches

seanandruby
Site Admin
Posts: 4713
Joined: Mon Jun 26, 2006 11:01 am
Location: eastbourne

Post: # 53102Post seanandruby

How did it go junior?
sean

Post Reply