Pipe laying - 450mm concrete
-
- Posts: 3
- Joined: Tue Aug 17, 2010 8:28 pm
- Location: england
hi to the forum. can any members help me with problem. i will be laying 450mm concrete pipes, want to know what goes in manhole is it butt end or spigot end and what do i come out of manhole with spigot or butt end, and i have pipes with 6in holes in to pick up gullies do these pipes have to be laid so hole is at top or on side to pick up gullies, and when setting laser how do i set it for the direction to the next manhole pin set buy the engineer. thanks in advance for any help..
construction
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 3
- Joined: Tue Aug 17, 2010 8:28 pm
- Location: england
-
- Posts: 1136
- Joined: Sun May 08, 2005 9:25 am
- Location: North West
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
laying pipes that needs a machine to lift them in place is a risky job in the wrong hands, ie unskilled labour. You need a square end going into the manhole with coller out to take the rocker pipe. That's ok if your going up the trench but sometimes there is a need to lay down flow, which makes it that much harder to push them home. The holes need to be top and use a slight radius for direction.
sean
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
......sorry doing on phone, so limited to amount of text. Push them in square with machine using 6x4 to stop damage to pipe. You can tweak them over once their in but only a few degrees on each pipe. Use plenty of greece if already got rubber in, no greece if it's a seperate rubber. Hope this helps.
sean
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
-
- Site Admin
- Posts: 1854
- Joined: Tue Aug 19, 2008 7:03 pm
- Location: kings lynn norfolk
- Contact:
So where in Greece are you laying the pipe the sean or are we using pipe lube grease..... MSHseanandruby wrote:. Use plenty of greece if already got rubber in, no greece if it's a seperate rubber. Hope this helps.
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk
http://mshpaving.co.uk
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
are you using trench shoring? how deep are the pipes, trench boxes or sheet pilling or battering the trench back to 45 degree sides? what you bedding them on and back filling with?
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
well done you found the deliberate mistake. I can see i will have to make it trickier for you next time. Just came back from 2 weeks in crete, so grease is on my mind at the moment :;):msh paving wrote:seanandruby wrote:. Use plenty of greece if already got rubber in, no greece if it's a seperate rubber. Hope this helps.
So where in Greece are you laying the pipe the sean or are we using pipe lube grease..... MSH
sean
-
- Posts: 1136
- Joined: Sun May 08, 2005 9:25 am
- Location: North West
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne